Laserfiche WebLink
015 <br />REGULAR MEETING <br />JUNE 10, 2002 <br />Non -Discrimination Commitment form was not included in Bid Packet <br />Ten per cent (10%) Bid Bond was submitted <br />IC M <br />One (1) 2002 Vactor Model 2110 Less Trade $184,989.00 <br />Option No. 1 <br />Included <br />Option No. 2 <br />Included <br />Option No. 3 <br />$ 1,890.00 <br />Option No. 4 <br />$ 1,800.00 <br />Option No. 5 <br />Not Available <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above bid was referred <br />to Equipment Services and the Street Department for review and recommendation. <br />AWARD BID - CENTURY CENTER REMODELING - PROJECT NO. 102-029 <br />Mr. Scott Herczeg, Century Center, advised the Board that on June 6, 2002, bids were received and <br />opened for the above referred to project. After reviewing those bids, Mr. Herczeg recommends that <br />the Board award the contract to the lowest, responsive and responsible bidder, Ziolkowski <br />Construction,1005 South Lafayette, South Bend, Indiana, in the amount of $331,201.00. Therefore, <br />Mr. Littrell made a motion that the recommendation be accepted and the bid be awarded as outlined <br />above. Mr. Inks seconded the motion which carried. <br />APPROVE FINAL CHANGE ORDER AND PROJECT COMPLETION AFFIDAVIT - 617 <br />SOUTH PULASKI STREET IMPROVEMENTS - L.L. GEANS CONSTRUCTION - PROJECT <br />NO. 102-003 <br />Mr. Gilot advised that Mr. Toy Villa, Public Construction Manager has submitted the Final Change <br />Order indicating that the contract amount be increased by $3,262.84 for a new contract sum <br />including this Change Order in the amount of $15,837.14. Additionally submitted was the Project <br />Completion Affidavit indicating this new final cost. Mr. Bodnar stated that the original contract for <br />the improvements on this property was $12,574.30. I.C. 36-1-12-18(d) states that the total of all <br />change orders that increase the scope of the project may not exceed 20%, but, "a change order issued <br />as a result of circumstances that could not have been reasonably foreseen does not increase the scope <br />of the project." The allowable 20% equals $2,514.86. Two of the six items which cause the overrun <br />fall into the "not reasonably foreseen circumstances" category. Item 1, $194.95, was for the removal <br />of a small section of walks which was found under the sod during the removal process. While on <br />the property, this was not scheduled to be removed because its existence was not known. It was not <br />reasonably foreseeable that there was concrete under the sod. The second and more substantial item <br />is the concrete drive approach. Part of that work was due to a collapse of the previously existing <br />drive. That portion of the drive, which had in fact been the floor of a garage that existed upon the <br />inspection preparation for the project, was only two inches thick. It would reasonably be expected <br />that in an old garage (built at a time when cars were much heavier) the concrete would be at least <br />three or four inches thick. Because of the collapse of this floor, an additional 14.44 square yards of <br />concrete was needed. At $42.00 per square yard, this amounts to $606.48. Subtracting these two <br />items from the total does not bring the work under the 20% allowable excess, but it reduced to <br />$249.79, the amount which cannot be paid by the City. Upon a motion made by Mr. Inks, seconded <br />by Mr. Littrell and carried, the Final Change Order and the Project Completion Affidavit were <br />approved. <br />APPROVE CLAIMS <br />Mr. Gilot stated that the following claims were submitted to the Board for approval: <br />Name <br />Amount of Claim <br />Date <br />City of South Bend <br />$2,439,662.60 <br />June 10, 2002 <br />Mr. Gilot made a motion that the claims be approved and the reports as submitted be filed. Mr. <br />Littrell seconded the motion which carried. <br />1 <br />