My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/10/2005 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2005
>
10/10/2005 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:09:36 PM
Creation date
8/16/2016 12:45:12 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 3 2 REGULAR MEETING <br />OCTOBER 10, 2005 <br />OPENING OF QUOTATIONS — LINCOLNWAY WEST CURB AND SIDEWALK <br />REPLACEMENT — LINCOLNWAY WEST AND TAYLOR PROJECT NO. 105-077 <br />(COIT/COMMERCIAL CORRIDOR PROJECT) <br />This was the date set for receiving and opening of sealed quotations for the above <br />referred to project. The Clerk tendered proofs of publication of Notice in the South Bend <br />Tribune and the Tri-County News, which were found to be sufficient. The following <br />quotations were opened and publicly read: <br />L.L. GEANS CONSTRUCTION COMPANY <br />1923 North Home Street <br />Mishawaka, Indiana 46545 <br />QUOTATION: $9,426.00 <br />RAM CONSTRUCTION <br />1957 Denslow Drive <br />South Bend, Indiana 46544 <br />QUOTATION: $2,345.00 <br />MCINTYRE JONES INC. <br />2522 West 6t Street <br />Mishawaka, Indiana 46544 <br />QUOTATION: $3,012.99 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks, and carried, the above <br />quotations were referred to the Division of Engineering for review and recommendation. <br />OPENING OF QUOTATIONS/QUOTATION AWARD — CONCRETE REPAIRS <br />FALL 2005 — PROJECT NO. 105-078 (LRSA) <br />This was the date set for receiving and opening of sealed quotations for the above <br />referred to project. The Clerk tendered proofs of publication of Notice in the South Bend <br />Tribune and the Tri-County News, which were found to be sufficient. The following <br />quotations were opened and publicly read: <br />SELGE CONSTRUCTION COMPANY INC. <br />2833 South 111Street <br />Niles, Michigan 49120 <br />QUOTATION: $32,460.00 <br />KASER SPRAKER CONSTRUCTION, INC. <br />25487 West State Road 2 <br />South Bend, Indiana 46618 <br />QUOTATION: $38,050.00 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks, and carried, the above <br />quotations were referred to the Division of Engineering for review and recommendation. <br />After reviewing those quotations, Mr. Jason Durr, Engineering, recommends that the <br />Board award the contract to the lowest, responsible and responsive bidder, Selge <br />Construction Co., Inc., 2833 South 11t' Street, Niles, Michigan, in the amount of <br />$32,460.00. Therefore, Mr. Inks made a motion that the recommendation be accepted <br />and the quotation be awarded as outlined above. Mr. Littrell seconded the motion, which <br />carried. <br />7I <br />LJ <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.