My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - Greenlawn Water Main Replacement Proj No 122-041 A&Z Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to PSA - Greenlawn Water Main Replacement Proj No 122-041 A&Z Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:40:12 PM
Creation date
4/28/2026 2:40:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
Text box
ID:
1
Creator:
Created:
4/28/2026 2:40 PM
Modified:
4/28/2026 2:40 PM
Text:
mailto:janabtawi@az-engineering.net
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> April 28, 2026 <br /> <br /> <br />Mr. Jamal Anabtawi, <br />A&Z Engineering, LLC <br />1220 Ruston Pass <br />Fort Wayne, IN 46825 <br />janabtawi@az-engineering.net <br /> <br />RE: Amendment No. 2 to Professional Services Agreement <br /> <br />Dear Mr. Anabtawi: <br /> <br /> At its April 28, 2026 meeting, the Board of Public Works approved the above <br />referenced amendment for additional Engineering Services, Including Railroad Permit <br />Resubmission, Construction Observation, Geotechnical Services, and Survey Services <br />for the Greenlawn Water Main Replacement Project, Project No. 122-041 in the amount <br />of $37,190. <br /> <br /> Enclosed please find a copy of the amendment for your records. <br /> <br /> <br />Sincerely, <br /> <br />/s/ Hillary Horvath <br /> <br />Hillary Horvath, Clerk <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.