Laserfiche WebLink
31 <br />G.30.1 <br />CSO outfall monitoring <br />CSO 49 Sample and Lincolnway, E <br />No <br />32 <br />G.30.4 <br />CSO monitoring <br />CSO 31, Eddy and Northside <br />No <br />33 <br />G.31.1 <br />Basin Monitming/Control <br />Beek's Lake <br />No <br />34 <br />G.32.1 <br />Trunkline Monitoring <br />Ewing and Fellows <br />No <br />35 <br />G.34.1 <br />Trunkline Monitoring <br />Taylor and Western <br />No <br />36 <br />G.36.1 <br />CSO monitoring <br />CSO 37 Pleasant and 21 st <br />No <br />37 <br />I.SA.SB.I <br />Trunkline Monitoring <br />TMP 18-3, Dubail and High <br />No <br />38 <br />LSA.SB.2 <br />Trunkline Monitoring <br />TMP 18-4, Donald and High <br />No <br />39 <br />1SA.SB.3 <br />Trunkline Monitoring <br />TMP 18-5, Erskine and Eckman <br />No <br />40 <br />LSA.SB4 <br />Basin Monitoring/Control <br />Oliver Plow Basin <br />No <br />41 <br />G.37.1 <br />Trunkline Monitoring <br />LaSalle and Main <br />No <br />42 <br />LSA.SB.S <br />Basin Monitoring <br />TJX South Basin <br />Yes <br />43 <br />LSA.SEL6 <br />Basin Monitoring <br />TJX North Basin <br />Yes <br />44 <br />1SA.SB.7 <br />Sewer Monitoring <br />Indiana and Walnut <br />Yes <br />45 <br />LSA.SB.I I <br />Sewer Monitoring <br />Indiana and Philippa <br />Yes <br />46 <br />I.SA.SB.12 <br />Sewer Monitoring <br />Donald & Franklin <br />Yes <br />47 <br />I.SA.SB.13 <br />Sewer Monitoring <br />Indiana & Webster <br />Yes <br />48 <br />LSA.SBA4 <br />Sewer Monitoring <br />Dubai] & Walnut <br />Yes <br />49 <br />1,SA.27.2 <br />Sewer Monitoring <br />TMP 027-1, Corby and South Bend Ave <br />Yes <br />50 <br />LSA.27.3 <br />Sewer Monitoring <br />TMP 027-3, South Bend Ave and St. Peter <br />Yes <br />51 <br />1.33.2 <br />Sewer Monitoring <br />TMP 028-3, Madison and Sommers <br />Yes <br />52 <br />LSA.7.1 <br />Sewer Monitoring <br />TMP 006-1, Lincoln Way West and Madison St. <br />Yes <br />53 <br />LSA.7 2 <br />Sewer Monitoring <br />TMP 006-5, Lincoln Way West and Blaine <br />Yes <br />New Cellular Sites 2016 <br />River RC #3 stage at East Race <br />LSA.SB.15 <br />Pressure Transducer <br />River Monitoring <br />Interceptor at RC 03 <br />1.13.3 <br />Pressu re Tra nsducer <br />Interceptor Monitoring <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright 02009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Paee 18 <br />