My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - MWH America - CSO LTCP Reassessment Phase 1C
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
Professional Services Agreement - MWH America - CSO LTCP Reassessment Phase 1C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:06:13 PM
Creation date
7/12/2016 3:47:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/12/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
prepare a new Baseline WQ run, and update the Baseline Water Quality Scenario <br />Technical Memo developed under Phase IA. <br />4. Develop a water quality model optimization integration tool to support linkage between <br />the SWMM collection system model and the BLTM Water Quality Model for use in the <br />OptiS WMM optimization tool developed by EmNet that will allow for an integrated <br />analysis of improvement alternatives. This will involve developing a software "wrapper" <br />that allows for the ready transfer of CSO hydrograph data from the S WMM collection <br />system model into the BLTM water quality model, and exporting water quality results to <br />OptiS WMM. <br />5. Prepare a Technical Memorandum to document the water quality model optimization <br />integration tool. <br />Task 12 Deliverables <br />• Updated Technical Memoranda — Water Quality Model Calibration & Water Quality <br />Model 2015 Baseline Water Quality Scenario <br />• Technical Memorandum — St. Joseph River Water Quality Model Integration for <br />optimization analysis of improvement options. LimnoTech will be responsible for <br />production of this deliverable. <br />Task 12 Assumptions <br />• South Bend will provide their St. Joseph River and tributary (if available) monitoring <br />data from 2015. <br />• South Bend will assist the consultant with obtaining St. Joseph River and tributary <br />monitoring data from Elkhart and Mishawaka, if needed. <br />• The cities of Elkhart and Mishawaka will provide their water quality monitoring data <br />within four weeks of notice to proceed. <br />• Hourly volumes from collection system hydraulic model will be provided to the water <br />quality modeling consultant in a spreadsheet matrix for each of the LTCP scenarios. <br />• The Elkhart and Mishawaka LTCPs are appropriate representation of future CSO loads <br />from these communities. <br />• The year 1992 will continue to serve as the typical year. <br />• The water quality model optimization integration tool will be developed to run in a <br />Microsoft Windows Environment using the .Net platform and Access database. <br />• The water quality model optimization integration tool will allow for variation in the CSO <br />hydrographs, and the event mean concentration of E. coli in the CSO effluent. All of the <br />other inputs are expected to remain constant in the optimization runs. <br />South Bend LTCP Reevaluation - Phase 1C Amendment Page 6 <br />Revised 06/29/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.