My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - MWH America - CSO LTCP Reassessment Phase 1C
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
Professional Services Agreement - MWH America - CSO LTCP Reassessment Phase 1C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:06:13 PM
Creation date
7/12/2016 3:47:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/12/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Quality Control - Quality Control (QC) procedures will be employed in order to maintain <br />work product quality. These procedures will address the use of quality control reviews, <br />engineering and calculations checking, conceptual design checking, construction and <br />operation issues, and other measures necessary to maintain a consistent, complete, high <br />quality and compatible plan. A formal QC review will be conducted on key technical <br />memorandum. City staff will be invited to contribute to quality reviews. <br />Task 8 — Coordination Meeting with Advisory Committee (Lead Firm: MWH with local <br />support from ASI) <br />Ongoing communication and coordination with the CSO Advisory Committee established by the <br />City during Phase lA/113 of the reevaluation effort is important to the development of local <br />support for ongoing CSO control efforts. During Phase I of the effort, MWH will: <br />1. Communicate with City staff to develop an agenda for and schedule a progress meeting <br />with the CSO Advisory Committee <br />2. Prepare advance materials and conduct a meeting with the CSO Advisory Committee to <br />discuss updated financial data pertaining to LTCP alternatives or wholesale changes and <br />solicit input regarding the City's strategy for ongoing refinement and implementation of <br />the LTCP. <br />3. Document key discussions from the Advisory Committee meeting in the form of written <br />meeting notes. <br />Task 8 Deliverables <br />• Meeting Agenda, Presentation Materials, and Notes —Phase IC Advisory Committee <br />Meeting. MWH will be responsible for production of this deliverable. <br />Task 9 — Collection System Model Refinement (Lead Firm: MWH) <br />Modifications made to the City's previous collection system model during the Phase IA/1B <br />Reevaluation effort significantly improved the representation of the existing service area and <br />infrastructure and resulted in improved agreement between model results and observed <br />conditions. This task will involve additional model refinement as required to further improve the <br />model's ability to predict system performance and prepare for use of the model for an <br />optimization analysis. Specific refinement efforts will include: <br />South Bend LTCP Reevaluation - Phase 1C Amendment Page 3 <br />Revised 06/29/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.