Laserfiche WebLink
REGULAR MEETING .TUNE 14, 2016 202 <br />AWARD BID — FIVE THOUSAND 5 000 MORE OR LESS UNIVERSAL/NESTABLE <br />REFUSE CONTAINERS (SPEC X) (SUBJECT 'r0 SOLID WASTE CAPITAI LEASE <br />FUNDING) <br />Mr. Matt Chlebowski, Central Services, advised the Board that on May 24, 2016, bids were <br />received and opened for the above referenced containers. After reviewing those bids, Mr, <br />Chlebowski recommended that the Board award the contract to the lowest responsive and <br />responsible bidder Pyramid Equipment, Inc., 211 South Prairie, Rolling Prairie, Indiana 46371, <br />in unit prices not to exceed $150,000.00. Therefore, Mr. Reins made a motion that the <br />recommendation be accepted and the bid be awarded as outlined above. Ms. Maradik seconded <br />the motion, which carried. <br />AWARD QUOTATION — LINE STOPS FOR OLIVE/SAMPLE VALVE REPLACEMENT — <br />(WATER WORKS OPERATING <br />Mr. Ed Herman, Water Works, advised the Board that on May 24, 2016, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Herman recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Culy Contracting, Inc., 5 Industrial Park Drive, P. 0. Box 29, Winchester, <br />Indiana 47394, in unit prices, not to exceed the amount of $55,325.00. Therefore, Ms. Maradik <br />made a motion that the recommendation be accepted and the quotation be awarded as outlined <br />above. Mr. Relos seconded the motion, which carried.. <br />REJECT PROPOSALS AND APPROVE REQUEST TO ADVERTISE FOR BIDS - <br />FREMONT PARK SPLASH PAD (PARK BOND) <br />In a memo to the Board, Attorney Michael Schmidt informed the Board that the proposals for <br />this project need to be rejected after determining the project constitutes a "public works projeef' <br />as it is an "improvement paid for out of a public fund or special assessment" to public property. <br />He explained it was originally treated as a Request for Proposals. Mr. Schmidt requested the <br />Board approve a request to advertise for bids and the project will be awarded based on lowest <br />responsive and responsible bidder, rather than highest scoring proposal. Therefore, Ms. Maradik <br />made a motion that the recommendation be accepted and the proposals be rejected and the <br />project be advertised for bids as outlined above. Mr. Relos seconded the motion, which carried. <br />_ APPROVE CHANGE ORDER NO. 1 — SOUTH BEND ONE-WAY TO TWO-WAY <br />CONVERSION DIVISION A— PROJECT NO. 116-001 SSDATIF <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, Indiana 46614, for a <br />change in pavement materials with no change in. the Contract amount of $3,398,021.37. Upon a <br />motion made by Ms. Maradik, seconded by Mr. Relos and carried, the Change Order was <br />approved. <br />APPROVE CHANGE ORDER NO. 1 — SOUTH BEND ONE-WAY TO TWO-WAY <br />CONVERSION DIVISION B— PROJECT NO. 116-001 2015 TIF BOND <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. I on behalf <br />of Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, Indiana 46614, for a <br />change in pavement materials with no change in the Contract amount of S 16,321,642.00. Upon a <br />motion made by Ms. Maradik, seconded by Mr. Relos and carried, the Change Order was <br />approved. <br />APPROVE CHANGE ORDER NO. 3 — WASTEWATER TREATMENT PLANT <br />SECONDARY TREATMENT IMPROVEMENTS — PROJECT NO. 114-053 <br />BOND) 2012 SEWER <br />Mr. Gilot advised that Mr. Jacob Klosinski, Utilities, has submitted Change Order No. 3 on <br />behalf of Thieneman Construction, Inc., 17241 Foundation Parkway, Suite 100, Westfield, <br />Indiana 46074, indicating the Contract amount be increased by $91,038.50 for a new Contract <br />sum, including this Change Order, in the amount of $11,986,221.75. Upon a motion made by <br />Mr. Reins, seconded by Ms. Maradik and carried, the Change Order was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — 2015 UTILITY CUT REPAIRS - <br />PROJECT NO 11547-5 (SEWERS OPERATIONS AND MAINTENANCE) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, Indiana 46614, <br />