Laserfiche WebLink
11 /23/2015 <br /> Purpose of these Bills <br /> Charge reasonable fees to recover the costs of providing services: <br /> Site, Drainage, Subdivision, and Zoning Approval <br /> Excavation permits <br /> Construction or repair of sidewalks, curbs, gutters, driveways, alleys and <br /> roadways; <br /> Occupancy(Barricade) permits <br /> The Permit Deficit <br /> • The Capitol collected from the Permit Current Permit Deficit Analysis <br /> Fees in 2014 totaled $24,585 5200,000 <br /> 5150,000 <br /> • The Estimated Expenses that the 5100,000 <br /> Department Assumed by processing <br /> and reviewing permits in 2014 totaled 550,000 ■Capitol Collected <br /> $147,685 so <br /> ✓Expenses <br /> •Current Deficit <br /> 1550,0001 <br /> • 2014 Net Diff = $123,100 <br /> ($100,000) <br /> 15150,0001 <br /> 2 <br />