Laserfiche WebLink
(kI i ( l 1 11/23/2015 <br /> (Proposed BBIIs <br /> 68-15 , 69-15 <br /> eludes New Rules, Regulations, and \Addresses Engineering Service Charges <br /> Service Charges for Various Permits in-Connection with the Development <br /> and Reviews in Connection with Plan Application Process <br /> Stormwater Control and Construction <br /> in the Right-Of-Way <br /> CITY OF SOUTH BEND I DEPARTMENT OF PUBLIC WORKS <br /> 11/23/0015 63-15 6 69.15 <br /> Background <br /> Does not balance service with revenue currently. <br /> Many fees have not been adjusted since 1962. Inflation of the US Dollar has not <br /> been reconciled. <br /> Permit fees are a low percentage service cost born by the developer and <br /> contractor. Permit fees are an Industry expectation. Out-of-town developers are <br /> confused by our lack of or low fees. Fees are much lower than neighboring cities <br /> or we do not charge for them. <br /> Current Ordinance contains non-uniform Contractor bonding requirements with <br /> too short of a duration. <br /> 11/2312O15 6.:5 6 6 9-15 • <br /> 1 <br />