Bid Packages 1 through 3:
<br /> Description Original SA#1 SA#2 SA#3 SA#4 New Total
<br /> Amount
<br /> a. Field Survey(Including
<br /> Route Survey Plat)(BP 1-
<br /> 3) $73,000.00 $10,000.00 $18,700.00 $0.00 -$5,085.00 $96,615.00
<br /> b 1. Preliminary Roadway
<br /> Design and Plans(20%
<br /> Complete) $82,000.00 -$28,700.00 $0.00 $0.00 $0.00 $53,300.00
<br /> b 2.
<br /> Bid Package 1 $0.00 $202,000.00 $0.00 $0.00 $0.00 $202,000.00
<br /> c. Maintenance of Traffic
<br /> Concepts $8,000.00 -$4,000.00 $0.00 $0.00 $0.00 $4,000.00
<br /> d. Public Information
<br /> Meeting,Hourly Rate,as
<br /> required $6,000.00 $0.00 $0.00 $0.00 -$6,000.00 $ 0.00
<br /> e. Conceptual Traffic Signal
<br /> Design $20,500.00 -$8,200.00 $0.00 $0.00 $0.00 $12,300.00
<br /> I Utility Coordination,
<br /> Hourly Rate,as required
<br /> (BP 1-3) $8,000.00 $2,000.00 $5,000.00 $0.00 -$3,100.00 $11,900.00
<br /> g. Coordination with
<br /> Memorial Hospital and
<br /> INDOT,Hourly Rate,as
<br /> required(BP 1-3) $10,000.00 $2,500.00 $2,500.00 $0.00 -$921.25 $14,078.75
<br /> h. R/W Engineering(4 Parcels
<br /> @$2,700 per Parcel),if
<br /> required $27,000.00 -$10,800.00 -$5,400.00 $0.00 $0.00 $10,800.00
<br /> i. Title Abstracting(4 Parcels
<br /> @$325 per Parcel),if
<br /> required* $3,250.00 -$1,300.00 $0.00 $0.00 -$1,950.00 $ 0.00
<br /> j. Geotechnical Evaluation $7,500.00 $0.00 $15,000.00 $0.00 $0.00 $22,500.00
<br /> k. Bid Package 2 $0.00 $48,000.00 $0.00 $0.00 $0.00 $48,000.00
<br /> I. Bid Package 3 $0.00 $0.00 $130,000.00 $30,000.00 $0.00 $160,000.00
<br /> m. Bid Package 4(Abandoned '
<br /> Plans) $0.00 $0.00 $90,000.00 $0.00 -$63,000.00 $27,000.00
<br /> n 1. Subsurface Utility
<br /> Engineering(SUE)Area 1 $0.00 $0.00 $11,360.00 $0.00 $0.00 $11,360.00
<br /> n 2. Subsurface Utility
<br /> Engineering(SUE)Area 2 $0.00 $0.00 $11,360.00 $0.00 $0.00 $11,360.00
<br /> n 3. Subsurface Utility
<br /> Engineering(SUE)Area.3 $0.00 $0.00 $24,180.00 $0.00 -$14,508.00 $9,672.00
<br /> o. Right of Way Dedication
<br /> Plat $0.00 $0.00 $10,000.00 $0.00 -$10,000.00 $ 0.00
<br /> p. Bid Phase,Pre-
<br /> Construction Meeting and
<br /> Construction Phase Office
<br /> Services,Hourly Rate,as
<br /> required(BP 1-3) $0.00 $0.00 $8,000.00 $6,000.00 -$3,265.00 $10,735.00
<br /> q. Building Demolition
<br /> Services(Phase 3) $0.00 $0.00 $0.00 $10,500.00 $0.00 _ $10,500.00
<br /> Sub Total Change $211,500.00 $320,700.00 $46,500.00 ($107,829.25)
<br /> Sub-Total Fee $245,250.00 $716,120.75
<br /> 5 of 8
<br /> Supplemental Agreement No. 4
<br />
|