Laserfiche WebLink
Bid Packages 1 through 3: <br /> Description Original SA#1 SA#2 SA#3 SA#4 New Total <br /> Amount <br /> a. Field Survey(Including <br /> Route Survey Plat)(BP 1- <br /> 3) $73,000.00 $10,000.00 $18,700.00 $0.00 -$5,085.00 $96,615.00 <br /> b 1. Preliminary Roadway <br /> Design and Plans(20% <br /> Complete) $82,000.00 -$28,700.00 $0.00 $0.00 $0.00 $53,300.00 <br /> b 2. <br /> Bid Package 1 $0.00 $202,000.00 $0.00 $0.00 $0.00 $202,000.00 <br /> c. Maintenance of Traffic <br /> Concepts $8,000.00 -$4,000.00 $0.00 $0.00 $0.00 $4,000.00 <br /> d. Public Information <br /> Meeting,Hourly Rate,as <br /> required $6,000.00 $0.00 $0.00 $0.00 -$6,000.00 $ 0.00 <br /> e. Conceptual Traffic Signal <br /> Design $20,500.00 -$8,200.00 $0.00 $0.00 $0.00 $12,300.00 <br /> I Utility Coordination, <br /> Hourly Rate,as required <br /> (BP 1-3) $8,000.00 $2,000.00 $5,000.00 $0.00 -$3,100.00 $11,900.00 <br /> g. Coordination with <br /> Memorial Hospital and <br /> INDOT,Hourly Rate,as <br /> required(BP 1-3) $10,000.00 $2,500.00 $2,500.00 $0.00 -$921.25 $14,078.75 <br /> h. R/W Engineering(4 Parcels <br /> @$2,700 per Parcel),if <br /> required $27,000.00 -$10,800.00 -$5,400.00 $0.00 $0.00 $10,800.00 <br /> i. Title Abstracting(4 Parcels <br /> @$325 per Parcel),if <br /> required* $3,250.00 -$1,300.00 $0.00 $0.00 -$1,950.00 $ 0.00 <br /> j. Geotechnical Evaluation $7,500.00 $0.00 $15,000.00 $0.00 $0.00 $22,500.00 <br /> k. Bid Package 2 $0.00 $48,000.00 $0.00 $0.00 $0.00 $48,000.00 <br /> I. Bid Package 3 $0.00 $0.00 $130,000.00 $30,000.00 $0.00 $160,000.00 <br /> m. Bid Package 4(Abandoned ' <br /> Plans) $0.00 $0.00 $90,000.00 $0.00 -$63,000.00 $27,000.00 <br /> n 1. Subsurface Utility <br /> Engineering(SUE)Area 1 $0.00 $0.00 $11,360.00 $0.00 $0.00 $11,360.00 <br /> n 2. Subsurface Utility <br /> Engineering(SUE)Area 2 $0.00 $0.00 $11,360.00 $0.00 $0.00 $11,360.00 <br /> n 3. Subsurface Utility <br /> Engineering(SUE)Area.3 $0.00 $0.00 $24,180.00 $0.00 -$14,508.00 $9,672.00 <br /> o. Right of Way Dedication <br /> Plat $0.00 $0.00 $10,000.00 $0.00 -$10,000.00 $ 0.00 <br /> p. Bid Phase,Pre- <br /> Construction Meeting and <br /> Construction Phase Office <br /> Services,Hourly Rate,as <br /> required(BP 1-3) $0.00 $0.00 $8,000.00 $6,000.00 -$3,265.00 $10,735.00 <br /> q. Building Demolition <br /> Services(Phase 3) $0.00 $0.00 $0.00 $10,500.00 $0.00 _ $10,500.00 <br /> Sub Total Change $211,500.00 $320,700.00 $46,500.00 ($107,829.25) <br /> Sub-Total Fee $245,250.00 $716,120.75 <br /> 5 of 8 <br /> Supplemental Agreement No. 4 <br />