c. Utility Abandonment <br /> The ENGINEER shall identify the general approach/guidance as how utility <br /> abandonment will occur. This shall include general provisions for the plugging <br /> or capping of lines to be abandoned/demolished, which connect to active lines <br /> intended to remain in place throughout demolition. <br /> 6. Add Sections 15-18 to Appendix "B" as follows: <br /> 15. Preparation of a Phase I and ll Environmental Site Assessment and Asbestos inspection <br /> and Abatement. <br /> 16. Available capacity and connection to storm sewer with OWNER'S consultant. <br /> 17. Video of condition of the storm sewer infrastructure. <br /> 18. Plans for surrounding streets by OWNER's consultant. <br /> 7. Delete Section G. of Appendix "C" in its entirety and replace as follows: <br /> G. Bid Package 4—based on a bid opening of December 9, 2014: <br /> 1. Conceptual Layout(15%) will be submitted by September 18, 2014. <br /> 2. Preliminary Plans (50%) will be submitted by October 9, 2014, assuming Owner <br /> approval of Conceptual Layout by September 22, 2014. A review meeting will <br /> be held within 7 calendar days after submittal of plans. <br /> 3. Final Plans (90%) by October 29, 2014. A review meeting will be held within 7 <br /> calendar days after submittal plans. <br /> 4. Final Tracings (100%) by November 12, 2014, noon. <br /> 8. Section A.1 and A.2 of Appendix "D" is modified as follows: <br /> 1. The ENGINEER shall receive as payment for the work performed under this Agreement <br /> the total fee not to exceed of $823,950.00 $811,800.00, unless a modification of the <br /> agreement is approved in writing by the OWNER. <br /> 2. The ENGINEER will be paid for the work performed under Appendix "A" of this <br /> agreement on a Lump Sum basis in accordance with the following schedule, except as <br /> noted in the items below: <br /> 4 of 8 <br /> Supplemental Agreement No. 4 <br />