My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Ireland Rd Sidewalk Connector Proj No 125-036 - SJCA Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Ireland Rd Sidewalk Connector Proj No 125-036 - SJCA Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:40:03 PM
Creation date
4/28/2026 2:40:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />k) Final Tracings plans (For Letting/Bidding), signed and certified by the <br />Consultant, and approved by Owner. <br />l) Compile bid documents and attend bid opening meeting, and review bids. <br /> <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br /> <br />b. The responsibilities of Owner are modified as follows: <br />1) <br /> <br />c. For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />Road Design - $21,207.00 (LSUM) <br />Storm Sewer & Detention Design - $6,800.00 (LSUM) <br />Construction Phase Services - $3,400.00 (NTE) <br />Total $31,407.00 <br /> <br />d. The schedule for rendering services is modified as follows: <br />On Site Field Check Meeting - 5/8/2026 <br />Final Plans - 7/15/2026 <br />Bid Date - 8/11/2026 <br /> <br />f. Other portions of the Agreement (including previous amendments, if any) are <br />modified as follows: <br /> <br />[List other Attachments, if any] <br /> <br /> <br />5. Agreement Summary (Reference only) <br /> a. Original Agreement amount: $_96,176.00____________ <br /> b. Net change for prior amendments: $_N/A_________________ <br /> c. This amendment amount: $_31,407.00_________ <br /> d. Adjusted Agreement amount: $_127,538.00___________ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.