Laserfiche WebLink
Page 2 of 3 <br />56 56: Water Service Copper 1-1/2 Inch $ 5,258.82 <br />57 57: Water Service Copper 1 Inch $ 2,945.35 <br />59 59: Connection to Existing Water Main 6 Inch Priva $ 3,845.42 <br />74 74: Maintain Wastewater Service $ 4,650.00 <br /> <br />TOTAL CREDIT FOR UNDERRUNS $ 112,621.25 <br /> <br />OVERRUNS <br />20 20: Compacted Aggregate Base No. 53 $ 22,681.88 <br />21 21: HMA Pavement Base 880 LBS/SYS $ 53,958.00 <br />23 23: HMA Pavement Intermediate 275 LBS/SYS $ 6,934.04 <br />24 24: HMA Pavement Surface 165 LBS/SYS $ 7,951.58 <br />27 27: Concrete Curb and Gutter 6 Inch $ 2,561.50 <br />29 29: Concrete Sidewalk 4 Inch $ 1,926.00 <br />30 30: Concrete Curb Ramp $ 6,867.00 <br />39 39: Storm Sewer Manhole 48 Inch Dia. $ 7,340.66 <br />47 47: Fitting DI 11.25 Degree Bend 8 Inch $ 1,650.66 <br />64 64: Conduit HDPE 3 Inch (Lighting) $ 565.00 <br />65 65: Conduit HDPE 2 Inch (Lighting) $ 725.00 <br />66 66: Handhole (Lighting) $ 8,800.00 <br />67 67: Electrical Wiring (Lighting) $ 4,626.00 <br />76 76: Conduit HDPE 3 Inch (Telecommunications) $ 2,109.00 <br />77 77: Handhole (Telecommunications) $ 2,548.00 <br /> <br />TOTAL INCREASE FOR OVERRUNS $ 131,244.32 <br /> <br />CHANGE ORDER NO. 2 ITEMS <br /> <br />101 Added 4" Water Laterals $ 27,634.14 <br />102 Added McKinley Fire Hydrant $ 4,120.00 <br />103 Slussers Seedong for Ponds $ 12,104.76 <br />106 Slussers Tree - 1.75" Cal. $ 7,280.00 <br />107 Slussers Tree - 2" Cal $ 11,500.00 <br />108 Footer/Rubble Pile Removal $ 9,116.80 <br /> <br />TOTAL INCREASE FOR CHANGE ORDER NO. 2 ITEMS $ 71,755.70 <br /> <br />SUMMARY <br />UNDERRUNS $112,621.25 CREDIT / DEDUCT <br />OVERRUNS $131,244.32 INCREASE <br />CHANGE ORDER NO. 2 ITEMS $ 71,755.70 INCREASE <br />NET CHANGE ORDER NO. 2 $ 90,378.77 NET INCREASE <br /> <br /> <br /> <br /> <br /> <br />