My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - YSB SB Thrive Subdivision Proj No 123-011 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Change Orders
>
Change Order No 2 - YSB SB Thrive Subdivision Proj No 123-011 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:35:21 PM
Creation date
4/28/2026 2:35:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 3 <br /> <br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Hillary Horvath, Clerk <br />Board of Public Works <br />FROM: Jacob M. Klosinski, PE, Assistant City Engineer <br />SUBJECT: Change Order No. 2 <br />123-011 Youth Services Bureau & South Bend Thrive Subdivision and <br />Offsite Improvements. <br />DATE: April 21, 2026 <br /> <br />The Division of Engineering requests the Board of Public Works approval of Change Order No. 2 <br />for Project No. 123-011 Youth Services Bureau & South Bend Thrive Subdivision and Offsite <br />Improvements. Change Order No. 2 encompasses adjustments to the balance of underruns and <br />overruns for unit price work identified in the original contract as well as some additional scope of <br />work that was required to complete both water main work on McKinley, communication conduit, <br />and electrical conduit adjustments based on code requirements and American Electric Power <br />conduit routing requirements for the lighting circuit. <br /> <br />Summary: Change Order No. 2 Items, Underrun (Credits) and Overrun (Increase) <br /> <br />UNDERRUNS <br />7 7: Structure Backfill (Undistributed) $ 1,125.60 <br />9 9: Storm Sewer Pipe Remove $ 117.15 <br />11 11: Concrete Approaches and Sidewalk Remove $ 1,267.56 <br />16 16: Structure Fence Remove $ 9,467.01 <br />22 22: HMA Pavement Base 440 LBS/SYS $ 5,684.58 <br />25 25: PCCP for Approaches 9 Inches $ 2,160.00 <br />26 26: PCCP for Approaches 6 Inches $ 2,082.08 <br />28 28: Concrete Curb 6 Inch $ 2,260.50 <br />31 31: Sodding Stormwater Ponds $ 16,473.00 <br />32 32: Sodding $ 1,418.34 <br />33 33: Trees 2.5 Inch Caliper $ 21,615.00 <br />34 34: Storm Sewer Pipe RCP 12 Inch $ 739.36 <br />35 35: Storm Sewer Pipe RCP 18 Inch $ 2,769.97 <br />36 36: Storm Sewer Pipe PVC C900 12 Inch $ 753.00 <br />38 38: Storm Sewer Catch Basin 30 Inch Dia. $ 7,308.18 <br />40 40: Sanitary Sewer Pipe PVC 8 Inch $ 2,032.35 <br />44 44: Water Main Pipe DI 8 Inch $ 635.14 <br />54 54: Water Service DI 6 Inch $ 6,273.48 <br />55 55: Water Service Copper 2 Inch $ 11,739.36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.