Laserfiche WebLink
<br />PUBLIC WATER UTILITY DISTRIBUTION PIPING <br />2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 8 <br />D. Use only nylon ropes, slings, or other lifting devices that will not damage the surface of the <br />pipe. <br />E. Keep the pipe clean and free of debris, dirt, animals, and trash during and after laying <br />operations. <br />F. At the close of each operating day, seal the open end of the pipe using a gasketed night cap. <br />3.4 INSTALLATION <br />A. Bedding: <br /> <br />1. Excavation: <br />1. This work shall be in accordance with all applicable sections of the City of South <br />limited to, Section 5-3.2. These documents are available online at <br />https://southbendin.gov/wp- <br />content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and <br />https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- <br />Specifications.pdf <br />2. Hand trim for accurate placement of pipe to elevations as indicated on Drawings. <br /> <br />2. Dewatering: <br /> <br />1. This work shall be in accordance with all applicable sections of the City of South <br />limited to, Section 5-3.3 These documents are available online at <br />https://southbendin.gov/wp- <br />content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and <br />https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- <br />Specifications.pdf <br /> <br />3. Place bedding material at trench bottom, level fill materials in one continuous layer not <br />exceeding 6 inches of compacted depth, and compact to 95 percent of maximum density. <br />B. Piping: <br />1. This work shall be in accordance with all applicable sections of the City of South Bend <br />Section 5-3.4. These documents are available online at https://southbendin.gov/wp- <br />content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and <br />https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- <br />Specifications.pdf <br />C. PE Encasement: <br /> <br />1. Encase piping in PE to prevent contact with surrounding backfill material. <br />2. Comply with AWWA C105. <br />3. Terminate encasement 3 to 6 inches above ground where pipe is exposed. Overlap 1 foot <br />in each direction at joints and secure around pipe.