My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Change Orders
>
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:35:15 PM
Creation date
4/28/2026 2:34:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PUBLIC WATER UTILITY DISTRIBUTION PIPING <br />2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 4 <br />2. Store gaskets for mechanical and push-on joints in cool and dry location, out of direct <br />sunlight, and not in contact with petroleum products. <br />3. Provide additional protection according to manufacturer instructions. <br />1.10 EXISTING CONDITIONS <br />A. Field Measurements: <br />1. Verify field measurements prior to fabrication. <br />2. Indicate field measurements on Shop Drawings. <br />1.11 WARRANTY <br />A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for warranties. <br />B. Furnish five-year manufacturer's warranty for valves. <br />PART 2 - PRODUCTS <br />2.1 US STEEL AND FOUNDARY PRODUCTS shall be used for all water main piping, fittings, <br />restrained joints, valves, tapping sleeves, and appurtenances <br />2.2 WATER PIPING <br />A. Ductile-Iron Pipe: <br />1. This work shall be in accordance with all applicable sections of the City of South Bend <br />Section 5-2.2(a). These documents are available online at https://southbendin.gov/wp- <br />content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and <br />https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- <br />Specifications.pdf <br />B. Jackets: PE encasement: <br /> <br />1. This work shall be in accordance with all applicable sections of the City of South Bend <br />Section 5-2.3. These documents are available online at https://southbendin.gov/wp- <br />content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and <br />https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- <br />Specifications.pdf <br />C. Corporation Stop and Curb Stop Assemblies: <br /> <br />1. This work shall be in accordance with all applicable sections of the City of South Bend <br />Section 5-2.5(g). These documents are available online at https://southbendin.gov/wp-
The URL can be used to link to this page
Your browser does not support the video tag.