My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Change Orders
>
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:35:15 PM
Creation date
4/28/2026 2:34:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXECUTION AND CLOSEOUT REQUIREMENTS <br />2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement <br />017000 - 6 <br />G. Time of Submittals: <br />1. For equipment or component parts of equipment put into service during construction with Owner's <br />permission, submit documents within ten days after acceptance. <br />2. Make other submittals within ten days after date of Substantial Completion, prior to final <br />Application for Payment. <br />3. For items of Work for which acceptance is delayed beyond Substantial Completion, submit within <br />ten days after acceptance, listing date of acceptance as beginning of warranty or bond period. <br />PART 2 - PRODUCTS - Not Used <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Verify that existing Site conditions and substrate surfaces are acceptable for subsequent Work. Beginning <br />new Work means acceptance of existing conditions. <br />B. Verify that existing substrate is capable of structural support or attachment of new Work being applied or <br />attached. <br />C. Examine and verify specific conditions described in individual Specification Sections. <br />D. Verify that utility services are available with correct characteristics and in correct locations. <br />3.2 PREPARATION <br />A. Clean substrate surfaces prior to applying next material or substance according to manufacturer's <br />instructions. <br />B. Seal cracks or openings of substrate prior to applying next material or substance. <br />C. Apply manufacturer-required or -recommended substrate primer, sealer, or conditioner prior to applying <br />new material or substance in contact or bond. <br />3.3 EXECUTION <br />A. Comply with manufacturer's installation instructions, performing each step in sequence. Maintain one set <br />of manufacturer's installation instructions at Project Site during installation and until completion of <br />construction. <br />B. When manufacturer's installation instructions conflict with Contract Documents, request clarification <br />from Engineer before proceeding. <br />C. Verify that field measurements are as indicated on approved Shop Drawings or as instructed by <br />manufacturer.
The URL can be used to link to this page
Your browser does not support the video tag.