Laserfiche WebLink
TEMPORARY FACILITIES AND CONTROLS <br />2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement <br />015000 - 1 <br />SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS <br />PART 1 - GENERAL <br />1.1 SECTION INCLUDES <br />A. Temporary Utilities: <br />1. Temporary electricity. <br />2. Temporary lighting for construction purposes. <br />3. Temporary water service. <br />4. Temporary sanitary facilities. <br />B. Construction Facilities: <br />1. Field offices and sheds. <br />2. Vehicular access. <br />3. Parking. <br />4. Progress cleaning and waste removal. <br />5. Traffic regulation. <br />6. Fire-prevention facilities. <br />C. Temporary Controls: <br />1. Barriers. <br />2. Security. <br />3. Water control. <br />4. Dust control. <br />5. Erosion and sediment control. <br />6. Noise control. <br />7. Pollution control. <br />D. Removal of utilities, facilities, and controls. <br />1.2 REFERENCES <br />A. ASTM International: <br />1. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building <br />Materials. <br />2. ASTM E 90 - Standard Test Method for Laboratory Measurement of Airborne Sound <br />Transmission Loss of Building Partitions and Elements. <br />3. ASTM E 119 - Standard Test Methods for Fire Tests of Building Construction and Materials.