My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Change Orders
>
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:35:15 PM
Creation date
4/28/2026 2:34:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PRICE AND PAYMENT PROCEDURES <br />2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 4 <br />C. Payment Includes: Full compensation for required labor, products, tools, equipment, plant and <br />facilities, transportation, services and incidentals; erection, application, or installation of item of <br />the Work; overhead and profit. <br />D. Final payment for Work governed by unit prices will be made on basis of actual measurements <br />and quantities accepted by Architect/Engineer multiplied by unit sum/price for Work <br />incorporated in or made necessary by the Work. <br />E. Unit Price Schedule: <br />1. Item 1: Mobilization and Demobilization <br />a. Description: This item covers the mobilization and demobilization of construction <br />equipment and personnel. Mobilization and demobilization shall include, but not <br />necessarily be limited to: site mobilization and demobilization, construction <br />engineering, obtaining all required permits, bonds, and insurance; installing and <br />removing temporary construction utilities, providing on-site sanitary facilities and <br />potable water facilities, street cleaning; snow removal; dust and mud control; and <br />all other incidentals not directly engaged in construction of the Project but which <br />are necessary to support the Work. <br />b. Basis of Payment: Lump Sum (LS) <br />c. Payment Details: For the purpose of payment, the pay quantity for the mobilization <br />portion of the Work will be limited to seventy-five percent (75%) of the total <br />contract bid amount for this Work item, which will be included in the first partial <br />payment estimate. The balance of the bid price shall be considered as <br />demobilization and will be paid for when all work is completed on the job and <br />final clean-up is completed. No additional payment will be made for <br />demobilization and remobilization, initiated by the Contractor, due to shutdowns, <br />suspensions of the Work, or for other mobilization activities. <br /> <br /> <br />2. Item 2: Maintenance of Traffic <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary for maintenance of traffic on the project site including but not limited to <br />detour route markers, construction signs, and barricades. Unless otherwise noted in <br />the plans, all roads shall be kept open to traffic while undergoing improvements. <br />The portion of the project being used by public traffic shall be kept in such <br />condition that such traffic will be accommodated adequately. Temporary <br />approaches to businesses, parking lots, residences, and crossings and intersections <br />with roads and streets shall be provided in a safe condition <br />b. Basis of Payment: Lump Sum (LS) <br /> <br />3. Item 3: Erosion and Sediment Control <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary for erosion and sediment control on the project site including but not <br />limited to inlet protection, silt fence, placing geotextile fabric, and maintenance of <br />erosion control measures. <br />b. Basis of Payment: Lump Sum (LS) <br /> <br />4. Item 4: 8-inch x 8-inch Tapping Sleeve and Valve <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete the installation of the tapping sleeve and valve and valve
The URL can be used to link to this page
Your browser does not support the video tag.