Laserfiche WebLink
TECHNICAL SPECIFICATION INDEX <br /> <br />CITY OF SOUTH BEND <br />MADISON LIFESTYLE DISTRICT PHASE I UTILITY DESIGN WATER MAIN REPLACEMENT PROJECT <br />TECHNICAL SPECIFICATIONS <br /> <br />Section Title <br /> <br />City of South Bend TABLE OF CONTENTS <br />Madison Lifestyle District Phase I Utility Design Water Main Replacement TOC- 1 <br />DIVISION 01 GENERAL REQUIREMENTS <br />01 01 00 Summary <br />01 20 00 Price and Payment Procedures <br />01 25 00 Substitution Procedures <br />01 30 00 Administrative Requirements <br />01 32 16 Construction Progress Schedule <br />01 33 00 Submittal Procedures <br />01 38 00 Preconstruction Audio-Video Documentation <br />01 40 00 Quality Requirements <br />01 50 00 Temporary Facilities and Controls <br />01 57 00 Maintenance of Traffic <br />01 60 00 Product Requirements <br />01 70 00 Execution and Closeout Requirements <br /> <br />DIVISION 03 CONCRETE <br />03 30 00 Concrete Pavement <br /> <br />DIVISION 09 FINISHES <br />09 30 00 Pedestrian Crosswalk Paint <br /> <br />DIVISION 31 EARTHWORK <br />31 05 13 Soils for Earthwork <br />31 05 16 Aggregates for Earthwork <br />31 23 16 Excavation <br />31 23 16.13 Trenching <br />31 23 19 Dewatering <br />31 25 00 Erosion and Sedimentation Controls <br /> <br />DIVISION 32 EXTERIOR IMPROVEMENTS <br />32 12 16 Asphalt Paving and Pavement Striping <br /> <br />DIVISION 33 UTILITIES <br />33 01 10.58 Disinfection of Water Utility Piping Systems <br />33 14 13 Public Water Utility Distribution Piping <br /> <br />