Laserfiche WebLink
REGULAR MEETING ARPIL 14, 2026 80 <br /> <br /> <br />President Maradik advised that Gemma Stanton, Engineering, has submitted change order <br />number 1 on behalf of INDOT/Rieth-Riley Construction Co., Inc., indicating the start date <br />be changed from June 8, 2026 to May 4, 2026, with no dollar amount change. Upon a <br />motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change <br />order was approved. <br /> <br />APPROVE CHANGE ORDER NO. 1 – MUESSEL PRIMARY/HOLY CROSS SCHOOLS – <br />PROJECT NO. 122-066 (PO-0037460) <br />President Maradik advised that Gemma Stanton, Engineering, has submitted change order <br />number 1 on behalf of INDOT/Milestone Contractors, L.P., indicating the start date be <br />changed from June 8, 2026 to March 30, 2026, with no dollar amount change. Upon a <br />motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change <br />order was approved. <br /> <br />APPROVE CHANGE ORDER NO. 1 – RIVERFRONT WEST URBAN NEIGHBORHOOD <br />DEVELOPMENT – PROJECT NO. 121-067 (PO-0037460) <br />President Maradik advised that Charlotte Brach, Engineering, has submitted change order <br />number 1 on behalf of C&E Excavating, Inc., indicating the contract amount be increased by <br />$522,000 for a new contract sum, including this change order, in the amount of $6,501,535. <br />Attorney Schmidt asked the Board to approve the $522,000 increase, but milestone 3 and <br />4 are still being finalized and will be brought to the Board at a later date. Upon a motion <br />made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change order was <br />approved for the dollar amount and conditional approval on the milestones. <br /> <br />APPROVE CHANGE ORDER NO. 1 (FINAL) AND PROJECT COMPLETION AFFIDAVIT – <br />2024 EVSE INSTALLATIONS – PROJECT NO. 124-052 (PO-0036708) <br />President Maradik advised that Kyle Ludlow, Engineering, has submitted change order <br />number 1 (final) on behalf of Barnes Concepts LLC, indicating the contract amount be <br />decreased by $91.25 for a new contract sum, including this change order, of $49,233.75. <br />Also submitted was the project completion affidavit indicating this new final cost of <br />$49,233.75. Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll <br />call, change order number 1 (final) and the project completion affidavit were approved. <br /> <br />APPROVE PROJECT COMPLETION AFFIDAVIT – SOUTH BEND CITY HALL <br />RENOVATION – PROJECT NO. 124-001 (ECONOMIC DEVELOPMENT LIT, TIF, WATER <br />& SEWER CAPITAL) <br />President Maradik advised that Rebecca Plantz, Engineering, has submitted the project <br />completion affidavit on behalf of Larson-Danielson Construction Co., Inc., for the above <br />referenced project, indicating a final cost of $7,921,618.86. Upon a motion made by VP <br />Molnar, seconded by Mr. Miller and carried by roll call, the project completion affidavit was <br />approved. <br /> <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE SHEET <br />– 2026 CONTRACTOR PAVING ROUND 2 – PROJECT NO. 126-026 (PR-00047128) <br />In a memorandum to the Board, Dan Jones, Engineering, requested permission to advertise <br />for the receipt of bids for the above referenced project. Also presented at this time for <br />approval and execution was the title sheet. Upon a motion made by VP Molnar, seconded <br />by Mr. Miller and carried by roll call, the above request to advertise was approved, and the <br />title sheet was approved and signed. <br /> <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE SHEET <br />– 2024 LEAD SERVICE LINE REPLACEMENTS NORTHWEST ZONE REBID – PROJECT <br />NO. 123-069CR (STATE REVOLVING FUND) <br />In a memorandum to the Board, Rebecca Plantz, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Also presented at this <br />time for approval and execution was the title sheet. Upon a motion made by VP Molnar, <br />seconded by Mr. Miller and carried by roll call, the above request to advertise was <br />approved, and the title sheet was approved and signed. <br />