My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1. 13546 Brick Road_COA 2025-0805 PACKET
sbend
>
Public
>
Historic Preservation
>
2025
>
August
>
1. 13546 Brick Road_COA 2025-0805 PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 10:08:42 AM
Creation date
8/13/2025 10:02:42 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
13546 Brick Road
HPC Document Type
Certification
HPC Local Landmark
ii. Unincorporated St. Joseph County
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Erie Insurance Group <br />April 22, 2025 <br />Page 8 <br /> <br /> <br />feet of wood soffit panels, reset detached decorative wood cornice, and <br />paint affected surfaces of approximately 40 square feet. <br />B. Remove and replace the fractured section of roof decking first story at west- <br />facing roof slope: 20 square feet of 1-inch in thickness deck boards, 300 <br />square feet of underlayment, 3 squares of asphalt composition shingles <br />covering the west-facing roof slope, and install 20 linear feet of 6 inches <br />gutter and 1 downspout. <br />C. Remove and replace the wood framing of the <br />structure; 40 each 2 inches by 6 inches rafter with 14 feet in length at 16- <br />inches on-center, 24 linear feet of 2 inches by 8 inches ridge beam, 600 <br />square feet of 1-inch in thickness decking, 600 square feet of underlayment, <br />6 squares of asphalt composition shingles, replace wood fascias and <br />overhangs, and install 24 linear feet of 6 inches gutter and 1 downspout. <br />D. Reconstruct the west CMU wall of the attached garage; replace 150 square <br />feet of 8 inches in thickness hollow core CMU (upper half of the wall), <br />remove and reset two west-facing windows, and paint the affected surfaces <br />of the west wall 150 square feet. <br />E. Reconstruct the south CMU wall of the attached garage; replace 160 square <br />feet of 8 inches in thickness hollow core CMU, remove and reset south- <br />facing window, replace 60 square feet of vinyl siding at south-facing gable <br />end, and paint the affected surfaces of the south wall 160 square feet. <br />F. Reconstruct the east CMU wall of the attached garage; replace 16 square <br />feet of 8 inches in thickness hollow core CMU, remove and replace east- <br />facing entry door, replace 16 feet wide overhead garage door, replace the <br />overhead garage door header, replace the overhead garage door trim, and <br />paint the affected surfaces of the east wall 200 square feet. <br />G. Repair the gypsum wallboard cracks in the ceiling and west wall of the <br />master bathroom and the ceiling of the kitchen; approximately 100 linear <br />feet. <br />H. Repaint the ceilings and wall repair areas at the master bathroom and <br />kitchen, approximately 400 square feet. <br /> <br /> <br />This report was prepared for the exclusive use of Erie Insurance Group and was <br />not intended for any other purpose. Our report was based on information made <br />available to us at the time. Should additional information become available, we <br />reserve the right to determine the impact, if any, the new information may have on <br />our opinions and conclusions, and to revise our opinions and conclusions if <br />necessary.
The URL can be used to link to this page
Your browser does not support the video tag.