Laserfiche WebLink
��0p11 AIADocument G704TM - 2000 <br />Certificate of Substantial Completion <br />PROJECT: (Name and adcb-ess) <br />PROJECT NUMBER: 71-24-696 <br />OWNER <br />City of South Bend Waste Water <br />CONTRACT FOR: HVAC <br />Treatment Plant 3113 Riverside Drive <br />ARCHITECT <br />South Bend, IN 46628 <br />CONTRACT DATE: 12/10/2024 <br />CONTRACTOR <br />0✓ <br />TO OWNER: (Name and address) <br />TO CONTRACTOR: (Name and address) <br />FIELD <br />City of South Bend Waste Water Treatment Plant <br />Veregy IN, LLC (fka Johnson Melloh Solutions <br />3113 Riverside Drive South Bend, IN 46628 <br />LLC dba Veregy) <br />OTHER <br />❑ <br />6406 Castleway Court, #100 <br />Project or portion of the Project designated for partial occupancy or use shall include: <br />1.Provide a 2-ton mini -split style air conditioning unit, wall mounted inside unit, and refrigerant piping to cool the office/lab in the <br />sludge building. <br />o nlo,e, MI—le <br />The'v'`'ork performed underthis Contract has been reviewed and found, to the Architect's best knowledge, information and <br />belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or <br />designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize <br />the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of <br />issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the <br />Contract Documents, except as stated below: <br />Warranty Date of Commencement <br />Per Manufactures Specifications 5/31/2025 <br />N/A N/A <br />ARCHITECT BY (Stgna/ure) <br />N/A <br />DATE OF ISSUANCE <br />.A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the <br />responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to <br />in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final <br />Certificate of Payment or the date of final payment. <br />Cost estimate of Work that is incomplete or defective: $ 0 <br />The Contractor will complete or correct the Work on the list of items attached hereto within 0 <br />( 0 ) days from the above date of Substantial Completion. <br />Veregy IN, LLC <br />CONTRACTOR BY (.Signaflwe) DATE <br />The Owner accepts the Work or designated portion as substantially complete and will assume full possession at <br />5:OOPM (time) on 3/1/2025 (dale). <br />CITY OF SOUTH BEND, INDIANA <br />BOARD OF PUBLIC WORKS E <br />Elizabeth A. Maradik, President <br />Gary A. Gilot, Member <br />po", 4 7­� <br />Murray L. Miller, Member <br />12 I_ <br />Vl <br />utilities, damage to the Work and insurance <br />Joseph R. Molnar, Vice President i review insurance requiremenu and coverage.) <br />Breana Micou, Member <br />d�� f #,/"� <br />Attest: Hillary R. Horvath, Clerk <br />Date: August 12, 2025 <br />c*iite.:s An rights reserved. WARNING: Thrs <br />tuclion or disvibulion of this AIA Ovcumeni. <br />maximum extent possible under the law. his <br />)rder no 2008340437 and is not for resale This <br />uced prior to its completion <br />0 <br />