Substantial Completion Affidavit -WWTP Solar GESC Proj No Proj 124-015 - Vergey LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Substantial Completion Affidavits
>
Substantial Completion Affidavit -WWTP Solar GESC Proj No Proj 124-015 - Vergey LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 12:08:58 PM
Creation date
8/12/2025 12:08:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIA Document G704 - 2000 <br />Certificate of Substantial Completion <br />PROJECT: (A'ame and adcb-ess) PROJECT NUMBER: 71-24-696 OWNER <br />City of South Bend Waste Water CONTRACT FOR: HVAC <br />Treatment Plant 3113 Riverside ARCHI'ECT <br />Drive South Bend, IN 46628 CONTRACT DATE: 12/10/2024 CONTRACTOR <br />TO OWNER: (Name and address) TO CONTRACTOR: (Name and address) FIELD <br />City of South Bend Waste Water Treatment Veregy IN, LLC (fka Johnson Melloh Solutions <br />Plant LLC dba Veregy) OTHER <br />3113 Riverside Drive South Bend, IN 46628 <br />6406 Castleway Court, #100 0 <br />Project or portion of the Project designated for partial occupancy or use shall include: <br />1.Provide a 2-ton mini -split style air conditioning unit, wall mounted inside unit, and refrigerant piping to cool the office/lab in the <br />sludge building. <br />o KIWAI tolnrlr <br />The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and <br />belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or <br />designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize <br />the Work for its intended use. The date of Substantial -Completion of the Projector portion designated above is the date of <br />issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the <br />Contract Documents, except as stated below: <br />Warranty Dale of Commencement <br />Per Manufactures Specifications 5/31/2025 <br />N/A N/A N/A <br />ARCHITECT BY (Signature) DATE OF ISSUANCE <br />A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the <br />responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to <br />in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final <br />Certificate of Payment or the date of final payment. <br />Cost estimate of Work that is incomplete or defective: $ 0 <br />The Contractor will complete or correct the Work on the list of items attached hereto within 0 <br />( 0 ) days from the above date of Substantial Completion. <br />Veregy IN, LLC <br />CONTRACTOR BY (Signaure) DATE <br />The Owner accepts the Work or designated portion as substantially complete and will assume full possession at <br />5:OOprrt (time) on 3/1/2025 (date). <br />CITY OF SOUTH BEND, INDIANA <br />BOARD OF PUBLIC WORKS <br />DATE <br />ntenance, heat, utilities, damage to the Work and insurance <br />Elizabeth A. Maradik, President Joseph R. Molnar, Vice President <br />a � Id determine and review insurance requirements and corerage.) <br />Gary A. Gilot, Member Breana Micou, Member <br />4 At fu <br />Murray L. Miller, Member Attest: Hillary R. Horvath, Clerk eKan insFluite of Arn[tecls. All rights reserved. WARNING: This <br />Date: August 12, 2025 Inaulhorized reproduction or distribution of this AfA� Document, <br />prosecuted to the maximum extent possible under the law 'his <br />document was created on 10126/2011 13 48:56 under the terms of AIA Documents -on -Demand" order no 2008340437 . and is not for resale This <br />document is licensed by the Amencar, Institute of Architects for one-time use only, and may not be reproduced prior to its completion. <br />