Laserfiche WebLink
Division A Division B <br />April 22, 2025 June 10, 2025 April 22, 2025 <br />2 2 3 <br />4,966,000.00$4,015,000.00$n/a <br />n/a n/a 936,674.00$ <br />n/a n/a 1,232,495.73$ <br />incomplete 3,670,297.00$n/a <br />n/a n/a 1,015,000.00$ <br />4,966,000.00$3,670,297.00$936,674.00$ <br />4,966,000.00$ <br />4,256,523.00$ <br />Certified: <br />Jeremy Roschyk, PE <br />Date: June 16, 2025 <br />R Yoder Construction <br />Selge Construction <br />Low Bid <br />Low Combined <br />Engineer's Estimate (January 2025) <br />Date of Bid Opening <br />No. of Bids <br />Bowen Engineering <br />C&E Excavating <br />HRP Construction <br />Bid Package 2 <br />4,606,971.00$ <br />4,809,643.00$ <br />Bid Package 1