Laserfiche WebLink
<br />(16) months from the Effective Date of this Agreement, or upon the issuance of the relevant <br />occupancy permit(s), whichever occurs last. <br />9. Dedication <br /> <br />Upon completion of the construction of the Dedicated Improvements substantially as <br />depicted in Exhibit A, the Owner shall also convey an easement and dedicate to the City within <br />such easement the Dedicated Improvements as public infrastructure. It is understood by the Owner <br />that no dedication shall be accepted by the City until all required easements have been conveyed, <br />accepted, and recorded by the City. The Owner shall use its best efforts to work with the City to <br />ensure that the Dedicated Improvements are dedicated to the City in a timely manner. <br />Additionally, prior to dedication, the following must be satisfied: <br /> <br />a. All parts and labor must meet the standards and requirements stated in the design <br />specifications as presented to and accepted by the City's Engineering Department. <br />b. Lien waivers must be received with regard to all workmanship and materials used in <br />connection with these improvements. <br />c. The Final Dedication must be furnished to Owner by the South Bend, Indiana Board of <br />Public Works. <br />d. Owner must provide copies of test reports or cut sheets on all materials supplied. <br /> <br />e. Owner must provide all tests required by City of South Bend Construction Standards and <br />Specifications or other governing bodies. Owner must provide fire flow test data on new <br />hydrants. <br />f. Owner must provide As-Built drawings in accordance with the City of South Bend <br />Prevailing Specifications for Public Works, which may be found at <br />https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- <br />Specifications.pdf