My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Main Line Extension Agreement Proj No DP25-006 - Basney Enterprises
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Water Main Line Extension Agreement Proj No DP25-006 - Basney Enterprises
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 12:17:49 PM
Creation date
6/24/2025 12:17:28 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />It shall be Owner’s sole responsibility and expense to obtain any and all permits associated <br />with the construction and installation of the Dedicated Improvements and to comply with all <br />applicable laws. <br />5. Engineer’s Estimate <br /> <br />The Owner has provided an Engineer’s Estimate (See Exhibit B, incorporated herein by <br />reference and attachment) for the cost to construct the Dedicated Improvements, including but not <br />limited to, excavation, pipe materials, valves, hydrants, and all other appurtenant materials, supplies <br />and equipment, permit fees, backfill and bedding, pavement, curbs, sidewalks, signs, and restoration <br />of the areas within the proposed R.O.W. <br />6. Performance Bond <br /> <br />Owner shall provide the City with a performance bond for an amount equal to one hundred <br />twenty-five percent (125%) of the construction cost covering all work performed or to be <br />performed pursuant to this Agreement. Owner’s failure to provide the performance bond as <br />prescribed herein shall cause this Agreement to be immediately terminated and of no effect, <br />without the requirement of notice. The performance bond shall be provided concurrently with the <br />execution of this Agreement. <br />7. Maintenance Bond <br />Within ten (10) days of City’s acceptance of the Dedicated Improvements, Owner shall <br />provide the City with a maintenance bond equal to ten percent (10%) of the construction cost <br />covering all work performed or to be performed pursuant to this Agreement, and such bond shall <br />remain in effect for three (3) years after dedication as described in Section 9 below. <br />8. Term <br /> <br />Except as otherwise provided herein, this Agreement shall continue for a period of sixteen
The URL can be used to link to this page
Your browser does not support the video tag.