My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Restoration of Tennis Courts at Marshall Park Proj No 125-026- WBK Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Restoration of Tennis Courts at Marshall Park Proj No 125-026- WBK Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 12:17:19 PM
Creation date
6/24/2025 12:17:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Also included is field support on concerns or interpretations through formal RFI and phone <br />conversations with City staff. No field visits are anticipated. <br />Support for processing change orders and project close out are also included in the scope on a <br />limited basis. <br />Assumptions: <br />•Full topographic survey is not included <br />•No drainage improvements or other utility work is necessary <br />•No new fencing or lighting <br />•No concrete repair other than crack filling <br />•Wiring to the lights for the concrete court will just be reconnected so that lights continue to <br />function (WBK will need to get from the City an as-built drawing of the underground electric <br />to the lights, or they will need to be located in the field prior to our site visit) <br />•No hazardous materials anticipated, and no evaluation or remediation included. <br />•A comprehensive geotechnical report is not necessary with pavement cores as noted <br />above. <br />•Construction support is based on the manhours in the attached manhour estimate and <br />scope noted herein. Only one site visit during construction is anticipated and included. <br />Additional field visits will be authorized by City staff as a supplemental service as <br />necessary. <br />•Construction material testing is not included. <br />•Bidding assistance is not included in this scope including responses to contractor <br />questions, bid tabulation, reference checks, etc. <br />•Preparation of formal bid documents is not included in this scope. We are providing <br />construction plans and specifications only.
The URL can be used to link to this page
Your browser does not support the video tag.