My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Restoration of Tennis Courts at Marshall Park Proj No 125-026- WBK Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Restoration of Tennis Courts at Marshall Park Proj No 125-026- WBK Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 12:17:19 PM
Creation date
6/24/2025 12:17:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Exhibit A – Scope of Services <br />City of South Bend <br />VPA Athletic Courts (Marshall Traditional School) <br />6-6-2025 <br />The City of South Bend is interested in removing/rehabilitating tennis court facilities at the <br />Marshall Traditional School, located at the northwest corner of Byron Drive and Springbrook <br />Drive, in South Bend, IN. The City would like to remove the existing asphalt courts (the west <br />courts) and restore that area to turf grass, and to rehabilitate and resurface the existing <br />concrete courts (the east courts), including new net posts and anchors. <br />Tasks associated with accomplishing the City’s desired objectives are provided hereafter. Also <br />attached is an estimate of WBK’s effort and fee. <br />Task 1 – Data Collection <br />WBK will coordinate and procure two to four pavement cores at the discretion of the City for <br />work within the site or for an adjacent City project. WBK will visit the project site and will <br />collect some limited existing conditions data with a handheld GPS unit and field measurements, <br />to assist in preparing a base sheet and in determining quantities. A full topographic survey is <br />not anticipated or included in this scope. We will prepare an existing conditions base sheet <br />using an aerial photo and the information collected while on site. <br />Task 2 - Engineering Plans & Bid Package <br />Using the base sheet created in Task 1, WBK will prepare a set of plans in accordance with City <br />of South Bend Standards. Specifications will primarily follow those used on recent tennis court <br />projects, with site-specific requirements added if needed. The plans will include the <br />rehabilitation of the east courts. It is anticipated that this work will consist of a crack filler <br />material, designed for concrete and compatible with the chosen tennis court surfacing material. <br />A proposed striping plan will be developed, and new net p osts/anchors will be shown. No <br />improvements to existing fencing, lighting or drainage are anticipated or included in this scope <br />of work. All work will be reviewed internally and submitted to the City for review prior to <br />finalizing construction / bid documents. We will incorporate the special provisions and plans <br />into the City’s boilerplate bid documents, creating one complete set of bid documents. We will <br />attend a virtual pre-bid meeting, and will answer questions during the bidding process . <br />Task 3 – Construction Support <br />This task includes review of shop drawings, material certifications and catalog cuts for <br />compliance with the plans and specifications. Reviews will be coordinated to facilitate the <br />contractor’s construction schedule. Review documentation will be provided to the City for each <br />submittal.
The URL can be used to link to this page
Your browser does not support the video tag.