Laserfiche WebLink
REGULAR MEETING JUNE 10, 2025 128 <br />This was the date set for receiving and opening sealed bids for the above referenced project. The <br />Clerk tendered proof of publication of the Notice in the South Bend Tribune, which was found to <br />be sufficient. The following Bids were opened and publicly read: <br />BOWEN ENGINEERING CORPORATION <br />8802 N. Meridian St. <br />Indianapolis, IN 46260 <br />Stout@bownenengineering.com; elaine.dabney@bowenengineering.com <br />Bid was signed by Mr. Doug Stout <br />Non-Collusion, Non-Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />One (1) of One (1) Addendum(s) Acknowledgement received. <br />BID: <br />Base Bid $4,015,000 <br />R. YODER CONSTRUCTION INC. <br />27453 County Road 150 <br />Nappanee, IN 46550 <br />shelly@ryoderconstruction.com <br />Bid was signed by Mr. Brad Yoder <br />Non-Collusion, Non-Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were incomplete. <br />One (1) of One (1) Addendum(s) Acknowledgement received. <br />BID: <br />Base Bid Total $3,670,297 <br />Upon a motion made by VP Molnar, seconded by Ms. Micou and carried by roll call, the above <br />bids were referred to Public Works for review and recommendation. <br />AWARD BID AND APPROVE CONTRACT – 2025 COMMUNITY CROSSINGS – PROJECT <br />NO. 125-004 (PR-00040469) <br />Leslie Biek, Engineering, advised the Board that on May 27, 2025, bids were received and opened <br />for the above referenced project. After reviewing those bids, Ms. Biek recommended that the <br />Board award the contract to the lowest responsive and responsible bidder, Milestone Contractors, <br />L.P., in the amount of $2,138,000, Divisions 1 & 2, plus Alternates 1 & 2. Therefore, VP Molnar <br />made a motion that the recommendation be accepted, and the bid be awarded, and the contract <br />approved as outlined above. Ms. Micou seconded the motion, which carried by roll call. <br />AWARD BID AND APPROVE CONTRACT – 2025 CURB AND SIDEWALK PROGRAM – <br />PROJECT NO. 125-001 (PR-00041142) <br />Gemma Staton, Engineering, advised the Board that on June 10, 2025, bids were received and <br />opened for the above referenced project. After reviewing those bids, Ms. Staton recommended that <br />the Board award the contract to the lowest responsive and responsible bidder, Selge Construction <br />Co., Inc., in the amount of $1,364,781.90; Base Bid Plus Alternates 1 &2. Therefore, VP Molnar <br />made a motion that the recommendation be accepted, and the bid be awarded, and the contract <br />approved as outlined above. Ms. Micou seconded the motion, which carried by roll call. <br />AWARD BID AND APPROVE CONTRACT – VPA LEEPER TENNIS COURTS <br />RECONSTRUCTION – PROJECT NO. 124-022 (Parks & Recreation) <br />Lidya Abreha, Engineering, advised the Board that on May 13, 2025, bids were received and <br />opened for the above referenced project. After reviewing those bids, Ms. Abreha recommended <br />that the Board award the contract to the lowest responsive and responsible bidder, Byrne & Jones <br />Construction, in the amount of $1,756,171.07, Base Bid Division A. Therefore, VP Molnar made <br />a motion that the recommendation be accepted, and the bid be awarded, and the contract approved <br />as outlined above. Ms. Micou seconded the motion, which carried by roll call. <br />APPROVE CHANGE ORDER NO. 2 – SEWER AND MANHOLE REHABILITATION – <br />PROJECT NO. 122-019 (PO-0013623)