Laserfiche WebLink
REGULAR MEETING JUNE 10, 2025 127 <br />C-TECH CORP. INC. <br />5300 W. 100 N. <br />Boggstown, IN 46110 <br />bswonger@c-techinc.net <br />Bid was signed by Mr. Brent Swonger <br />Non-Collusion, Non-Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />One (1) of One (1) Addendum Acknowledgement received. <br /> BID: <br />Division 1: South Side of Cleveland from Portage Road <br />to Riverside Drive <br />$117,405 <br />Division 2: South Side of Boland Drive East of <br />Ribourde Drive <br />$50,174 <br />Division 3: Intersection of Lilac Road and Eagle Point <br />Drive <br />$31,077 <br />Grand Total Base Bid, All Divisions $198,656 <br />Upon a motion made by VP Molnar, seconded by Ms. Micou and carried by roll call, the above <br />bids were referred to Public Works for review and recommendation. <br />OPENING OF BIDS – 2025 CONTRACTOR PAVING ROUND 1 – PROJECT NO. 125-032 <br />(PR-00040887) <br />This was the date set for receiving and opening sealed bids for the above referenced project. The <br />Clerk tendered proof of publication of the Notice in the South Bend Tribune, which was found to <br />be sufficient. The following Bids were opened and publicly read: <br />RIETH-RILEY CONSTRUCTION CO., INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />ralvarado@rieth-riley.com; dsauer@rieth-riley.com <br />Quotation was submitted by Mr. Ruben Alvarado <br />Non-Collusion, Non-Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />Two (2) of Two (2) Addendum(s) Acknowledgement received. <br />BID: <br />Base Bid Total $1,482,549 <br />MILESTONE CONTRACTORS, L.P. <br />24358 State Road 23 <br />South Bend, IN 46614 <br />epilipow@milestonelp.com <br />Quotation was submitted by Mr. Dustin P. Hilary <br />Non-Collusion, Non-Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />Two (2) of Two (2) Addendum(s) Acknowledgement received. <br />BID: <br />Base Bid Total $1,442,000 <br />Upon a motion made by VP Molnar, seconded by Ms. Micou and carried by roll call, the above <br />bids were referred to Public Works for review and recommendation. <br />OPENING OF BIDS – SOUTH WELL FIELD WATER TREATMENT AND PLANT <br />DISTRIBUTION SYSTEM IMPROVEMENTS – BID PACKAGE 2 – DIVISION A – PROJECT <br />NO. 117-059A (SOUTH TIF AND WATER CAPITAL FUND)