Laserfiche WebLink
60,001.00 to 61,000.00 350.00 <br /> 61,001.00 to 62,000.00 355.00 <br /> 62,001.00 to 63,000.00 360.00 <br /> 63,001.00 to 64,000.00 365.00 <br /> 64,001.00 to 65,000.00 370.00 <br /> 65.001.00 to 66,000.00 375.00 <br /> 66,001.00 to 67,000.00 380.00 <br /> 67,001.00 to 68,000.00 385.00 <br /> 68,001.00 to 69,000.00 390.00 <br /> 69,001.00 to 70,000.00 395.00 <br /> 70,001.00 to 71,000.00 400.00 <br /> 71,001.00 to 72.000.00 405.00 <br /> 72,001.00 to 73,000.00 410.00 1 <br /> 73,001.00 to 74,000.00 415.00 <br /> 74,001.00 to 75,000.00 420.00 <br /> 75,001.00 to 76,000.00 425.00 <br /> 76,001.00 to 77,000.00 430.00 <br /> 77,001.00 to 78,000.00 435.00 <br /> 78,001.00 to 79,000.00 440.00 <br /> 79,001.00 to 80,000.00 445.00 <br /> 80,001.00 to 81,000.00 450.00 <br /> 81,001.00 to 82,000.00 455.00 I <br /> 82,001.00 to 83,000.00 460.00 <br /> 83,001.00 to 84,000.00 465.00 <br /> 84,001.00 to 85,000.00 470.00 <br /> 85,001.00 to 86,000.00 475.00 <br /> 86,001.00 to 87,000.00 480.00 <br /> 87,001.00 to 88,000.00 485.00 <br /> 88,001.00 to 89,000.00 490.00 <br /> 89,001.00 to 90,000.00 495.00 <br /> 90,001.00 to 91,000.00 500.00 <br /> 91,001.00 to 92,000.00 505.00 <br /> 92,001.00 to 93,000.00 510.00 <br /> 93,001_00 to 94,000.00 515.00 <br /> 94,001.00 to 95,000.00 520.00 <br /> 95,001.00 to 96,000.00 525.00 <br /> 96,001.00 to 97,000.00 530.00 <br /> 97,001.00 to 98,000.00 535.00 <br /> 98,001.00 to 99,000.00 540.00 <br /> 99,001.00 to 100,000.00 545.00 <br /> 100,000 and up 550.00 <br /> Plus, per [one] thousand dollars ($1,000.00) of estimated construction cost thereafter, up to one <br /> million dollars($1,000,000.00) total estimated construction cost. 0.90 <br /> Plus, per one thousand dollars($1,000.00)of estimated construction costs thereafter 0.60 <br /> (3) Sixty dollars ($60.00) for each reinspection made by department inspectors of <br /> commercial and industrial projects. <br /> (4) Eighty dollars ($80.00) for each additional final inspection necessitated by the failure <br /> to pass the previous final inspection. <br /> (5) Reserved. <br /> Page 6 of 42 <br />