My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 11:56:28 AM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LaPorte, IN 46350 <br />302 Tyler Street <br />Ph : 219-362-2127 <br />Change Request <br />Phone: <br />Job:56-702 SB PUB WRKS-RCLN MRPHY ENCORE <br />Number: <br />Date: <br />9 <br />2/6/25 <br />To:Matt Puckett <br />SHIVE-HATTERY <br />321 SOUTH MAIN STREET, <br />SUITE 103 <br />SOUTH BEND, IN 46601 <br />Ph: (574)307-9990 <br />Description:CCD 1 ASI 1 FDC and Storz Connection <br />Source: CCD # 1 <br />We are pleased to offer the following specifications and pricing to make the following changes: <br />Provide a new fire department connection on the east side of the building addition at revised location. Work will consist of installing <br />a 4" water line and fitting and a new storz connection as shown on plan sheet C2.0, and detail sheet C3.0 as revised on 1/15/25. <br />Relocate fire department connection piping to ceiling space in level 1 lobby 101. Piping to extend vertically in wall between vestibule <br />100 and adjacent room 102, adjacent to column grid B-1. Coordinate with civil drawings. See sheets A101, P100, FP101, and <br />FP301. <br />Eliminate wing wall of curtain wall. <br />Revised Spec Section 211313 - Wet Pipe Sprinkler Systems <br />Revised Spec Section 088000 - Glazing <br />This CCD is being created to document scope changes that were part of ASI 1, incorporating changes required by the building/fire <br />department at the time of approval. <br />Description Material Subcontract Other PriceLaborEquipment <br />Earthwork $15,865.00$15,865.00 <br />Fire Suppression $11,098.00$11,098.00 <br />Entrances & Storefronts & Curt $-2,800.00$-2,800.00 <br />$24,163.00Subtotal: <br />$0.00OH&P Labor <br />$0.00OH&P Material <br />$0.00OH&P Equipment <br />$300.00Subcontractor First 3K 10.00%$3,000.00 <br />$1,481.00Subcontractor After 3K 7.00%$21,163.00 <br />$259.00Bond Markup 1.00%$25,944.00 <br />$26,203.00Total: <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.