Laserfiche WebLink
LaPorte, IN 46350 <br />302 Tyler Street <br />Ph : 219-362-2127 <br />Change Request <br />Phone: <br />Job:56-702 SB PUB WRKS-RCLN MRPHY ENCORE <br />Number: <br />Date: <br />8R <br />1/9/25 <br />To:Matt Puckett <br />SHIVE-HATTERY <br />321 SOUTH MAIN STREET, <br />SUITE 103 <br />SOUTH BEND, IN 46601 <br />Ph: (574)307-9990 <br />Description:CCD 3 High GFRC Cornice to Coping <br />Source: CCD # 3 <br />We are pleased to offer the following specifications and pricing to make the following changes: <br />Revise the detailing of the high cornice, remove GFRC high cornice and replace with standard metal coping see sheet A200, A353. <br />REVISION: This price is resolved to not include the 2 different textures. <br />Description Material Subcontract Other PriceLaborEquipment <br />Additional Terra Cotta $40,000.00$40,000.00 <br />Roofing $6,480.00$6,480.00 <br />Drywall $-32,958.00$-32,958.00 <br />L-D Reduction Based on Scheduling <br />Simplification <br />$-13,522.00$-13,522.00 <br />$0.00Subtotal: <br />$0.00OH&P Labor <br />$0.00OH&P Material <br />$0.00OH&P Equipment <br />$0.00Subcontractor First 3K <br />$0.00Subcontractor After 3K <br />$0.00Bond Markup <br />$0.00Total: <br />If you have any questions, please contact me at (219)575-6115. <br />Date: <br />Approved by:Submitted by:David J. Merkel <br />LARSON-DANIELSON CONST. CO INC <br />Page 1 of 1