My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 11:56:28 AM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order Request <br />To:Larson-Danielson Construction Co.Job Name:Raclin-Murphy Encore Project Manager: <br />Address: <br />Job Number:33267 Date:10/16/2024 <br />COR #1 <br /> <br /> <br /> <br /> <br />Material / Equipment / Design 6,177.08$ <br />Labor 4,921.18$ <br />Subcontracts -$ <br />Bond -$ <br />11,098.00$ <br />Please issue a change order accordingly. <br />Accepted by: <br />Name <br />Title Company <br />Title <br />Date: <br />Charles Van Senus <br />Total: <br />Pricing Breakdown: <br />Description of Work: <br />Per Change Request 9, relocate the fire department connection from the West side of the building over to the East side of the building. <br />Additionally, fire department connection will change to a free-standing type in liue of a wall mounted type. <br />Exclusions:Design, installation, flushing or testing of the underground piping or procurement and installation of the free-standing fire <br />department connection. <br />We are pleased to submit this proposal to perform extra work on the above referenced project. Listed below is a description of the work <br />included and a breakdown of pricing for your review. Proposed Change Order Scope and Pricing does not include any additional costs <br />associated with unforeseen conditions, unanticipated acceleration, trade stacking, delay caused by others, or cost escalation due to delay <br />caused by Contractor, Owner or Architect. If directed to proceed and unanticipated conditions, delays or factors noted are encountered, <br />Subcontractor will notify Contractor. <br />Hill Fire Protection <br />Charles Van Senus <br />Project Manager <br />Charles Van Senus
The URL can be used to link to this page
Your browser does not support the video tag.