My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 11:56:28 AM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
Text box
ID:
1
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Text:
$11,098.00
ID:
2
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Text:
Pricing does not include provisions for the design, installation, flushing or testing of the underground piping or procurement and installation of the free-standing fire department connection. Pricing includes credit for elimination of the wall mounted FDC and approximately 15' of 4" piping.
ID:
3
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Text:
$11,098.00
ID:
4
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Text:
2
ID:
5
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Text:
10/16/2024
ID:
6
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Text:
Charles Van Senus
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LaPorte, IN 46350 <br />302 Tyler Street <br />Ph : 219-362-2127 <br />Request for Quote <br />Date: <br />Contract: <br />Job:56-702 SB PUB WRKS-RCLN MRPHY ENCORE <br />RE:Change Request 9 <br />10/11/2024 <br />Due Date:10/16/2024 <br />56702-006 Fire Protection <br />To:HILL FIRE PROTECTION <br />11045 GAGE AVENUE <br />FRANKLIN PARK, IL 60131 <br />Ph: (847)288-5100 Fax: (866)434-6595 <br />Please review the proposed scope of work outlined below and forward the cost/credit and comments to my attention by <br />October 16, 2024. This is a request for pricing only and not an approved change. <br />CCD 1 ASI 1 FDC and Storz Connection <br />Provide a new fire department connection on the east side of the building addition. Work will consist of installing a 4" water line and <br />fitting and a new storz connection as shown on plan sheet C2.0, and detail sheet C3.0. <br />Relocate fire department connection piping to ceiling space in level 1 lobby 101. Piping to extend vertically in wall between vestibule <br />100 and adjacent room 102, adjacent to column grid B-1. Coordinate with civil drawings. See sheets A101, P100, FP101, and <br />FP301. <br />Replace 2 wing wall of curtain wall with 6" metal stud walls to see attached A101. <br />Revised Spec Section 211313 - Wet Pipe Sprinkler Systems <br />Revised Spec Section 088000 - Glazing <br />This CCD is being created to document scope changes that were part of ASI 1, incorporating changes required by the building/fire <br />department at the time of approval. <br />Amount No ImpactDescription <br />Fire Suppression <br />Total: <br />Date: <br />Submitted by:Requested by: <br /> Additional pricing/comments: <br />This work will _ Increase / _ Decrease HILL FIRE PROTECTION's schedule by _____ days. <br />David J. Merkel <br />Fax: (219)362-2848 <br />LARSON-DANIELSON CONST. CO INC <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.