Laserfiche WebLink
CITY OF SOUTH BEND <br />BOARD OF PUBLIC WORKS <br />REGULAR MEETING AGENDA <br />June 10, 2025 – 9:30 a.m. <br /> <br />Virtual Meeting Link http://tinyurl.com/2025BPWHybrid <br />1308 County-City Building, South Bend, IN 46601 <br /> <br /> <br />ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MICOU <br /> <br />Page 3 <br /> <br /> <br />B. Professional Services Agreement – JQOL Inc. <br />1. Description: Prepare Design and Bid Package for Reconstruction of <br />Mayflower Rd. to State Line Reconstruction Project No. 125-037 <br />2. Amount: $26,500 <br />3. Funding: PR-00041400 <br />C. Ratify Emergency Repair – G.E. Marshall, Inc. <br />1. Description: Emergency Repair Work to Excavate, Dewater, and Replace Pipe <br />Connected to the Edison Lift Station <br />2. Amount: $95,323.04 <br />3. Funding: PO-0035035 <br />D. Rescind Authorization for Entry for Environmental Remediation – MACOG <br />1. Description: Rescind Previous Agreement Signed 5/13/25 in Order to <br />Consider Revised Version <br />E. Authorization for Entry for Environmental Remediation – MACOG <br />1. Description: Agreement Authorization Entry upon Public Property/Right of <br />Way for Drilling and Environmental Remediation Purposes <br />F. Water and Sewer Extension Agreement – SDI South Bend, LLC <br />1. Description: Agreement to Construct Water and Sewer Main at Marion St. & <br />Leland Ave. for the Marion Court Subdivision Project No. DP24-063 <br />2. Title Sheet <br />G. Access to Separate Storm Sewer Agreement – Momentum Development Group <br />1. Description: Agreement to Connect to Separate Storm Sewer for the <br />Momentum Project at 510 S. Main St. Project No. DP24-030 <br />H. Professional Services Agreement – Abonmarche Consultants, Inc. <br />1. Description: Design of a Trail Connector on Madison St. from Hill St. to the <br />New Pedestrian Bridge Currently Under Design for the Madison Street Trail <br />Connector Project No. 125-031 <br />2. Amount: $57,600 <br />3. Funding: PR-00041428 <br />I. Amendment No. 1 to Professional Services Agreement – Lochmueller Group Inc. <br />1. Description: Design Engineering Services for the Marion Street Pedestrian <br />Bridge Project No. 123-060 <br />2. Amount: $430,000 <br />3. Funding: PO-0027470 <br />J. Memorandum of Understanding– South Bend Community Tennis Association <br />1. Description: VPA Leeper Courts Reconstruction <br />K. Concrete Replacement Agreement – Ziolkowski Construction, Inc. <br /> <br />