Laserfiche WebLink
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Angie Jacob, Clerk Board of Works <br />FROM: Tony Molnar <br />SUBJECT: Release of easement and dedication of easement <br />DATE: March 8, 2006 <br />The attached drawing and legal descriptions are for the release of one <br />easement and the dedication of a new easement. The easement to be released <br />does not have any City utilities located in it. It was supposed to have a storm sewer <br />located in it, but the sewer was never constructed. Instead a storm sewer was <br />located in the proposed easement to direct storm water from Viridian Drive into the <br />swaie located to the North of the existing lot. <br />Legal descriptions for both the easement to be released and for the new <br />easement appear to be correct. <br />If you have any questions, please feel free to call me at 9254. <br />Thanks, <br />Tony <br />F:\DATA\SHARE\ENGINEER\WPDATA\memoboard.wpd <br />