63. Sheet Sign, 0.080 in. 128 SFT $25.00 $3,200.00 $24.00 $3,072.00 $24.00 $3,072.00 $24.00 $3,072.00 64. Sheet Sign, 0.125 in. 15 SFT $25.00 $375.00 $29.00 $435.00 $29.00 $435.00 $29.00 $435.00 65. Sign Post, Square, Type 2, Reinforced Anchor Base 325 LFT $25.00 $8,125.00 $20.00 $6,500.00 $20.00 $6,500.00 $20.00 $6,500.00 66. Solar Powered Flashing Pedestrian Crossing Signage Assembly 2 EA $10,000.00 $20,000.00 $12,000.00 $24,000.00 $12,000.00 $24,000.00 $12,000.00 $24,000.00 67. Lighted Bollard 8 EA $900.00 $7,200.00 $5,000.00 $40,000.00 $5,000.00 $40,000.00 $5,000.00 $40,000.00 68. Line, Thermoplastic, Solid, White, 4" 1,875 LFT $2.00 $3,750.00 $1.10 $2,062.50 $5.00 $9,375.00 $5.00 $9,375.00 69. Line, Thermoplastic, Solid, White, 4", Grooved 880 LFT $2.00 $1,760.00 $2.10 $1,848.00 $6.00 $5,280.00 $6.00 $5,280.00 70. Line, Thermoplastic, Solid, Yellow, 4", Grooved 205 LFt $2.00 $410.00 $2.10 $430.50 $6.00 $1,230.00 $6.00 $1,230.00 71. Line, Thermoplastic, Solid, Blue, 4" 160 LFT $2.00 $320.00 $10.20 $1,632.00 $7.00 $1,120.00 $7.00 $1,120.00 72. Line, Thermoplastic, Solid, White, 6" 440 LFT $2.00 $880.00 $1.95 $858.00 $8.00 $3,520.00 $8.00 $3,520.00 73. Transverse Line, Thermoplastic, White, 24", Stop Bar 75 LFT $15.00 $1,125.00 $9.25 $693.75 $17.00 $1,275.00 $17.00 $1,275.00 74. Transverse Line, Thermoplastic, White, 24", Crosswalk 380 LFT $15.00 $5,700.00 $9.25 $3,515.00 $17.00 $6,460.00 $17.00 $6,460.00 75. Pavement Message Marking, Multicomponent, Tabled Intersection 6 EA $850.00 $5,100.00 $425.00 $2,550.00 $1,000.00 $6,000.00 $1,000.00 $6,000.00 76. Pavement Message Marking, Multicomponent, Handicap Space 2 EA $500.00 $1,000.00 $150.00 $300.00 $750.00 $1,500.00 $750.00 $1,500.00 77. Temporary Fence 1 LS $10,000.00 $10,000.00 $25,000.00 $25,000.00 $14,336.56 $14,336.56 $7,110.00 $7,110.00 Total$2,773,170.00 $2,559,630.45 $3,132,760.77 $2,933,000.00 Add Alternate A - Raised IntersectionEngineer's Estimate Selge Construction Rieth-Riley Construction Milestone ContractorsItem Description Unit Quantity Unit Price Amount Unit Price Amount Unit Price Amount Unit Price AmountNo.A1. Construction Engineering 1 LS $1,200.00 $1,200.00 $2,500.00 $2,500.00 $2,500.00 $2,500.00 $2,336.00 $2,336.00A2. OMITTEDA3. HMA Surface (Deduct) (35) TON $120.00 ($4,200.00) $116.25 ($4,068.75) $116.22 ($4,067.70) $139.00 ($4,865.00)A4. HMA Intermediate (Deduct) (55) TON $110.00 ($6,050.00) $103.24 ($5,678.20)* $103.22 ($5,677.10) $109.00 ($5,995.00)A5. HMA Base (Deduct) (130) TON $95.00 ($12,350.00) $88.00 ($11,440.00) $87.93 ($11,430.90) $89.00 ($11,570.00)A6. Joint Adhesive (Deduct) (310) LFT $2.00 ($620.00) $2.70 ($837.00) $2.66 ($824.60) $0.10 ($31.00)A7. PCCP, 8" 295 SYD $100.00 $29,500.00 $100.50 $29,647.50$137.19 $40,471.05 $160.00 $47,200.00A8. PCCP, Colored, 8" 95 SYD $200.00 $19,000.00 $145.00 $13,775.00 $192.24 $18,262.80 $169.00 $16,055.00A9. D-1 Contraction Joint 230 LFT $25.00 $5,750.00 $28.00$6,440.00 $13.81 $3,176.30 $42.00 $9,660.00A10. Concrete Curb 210 LFT $45.00 $9,450.00 $54.50 $11,445.00 $55.40 $11,634.00 $45.00 $9,450.00A11. Concrete Curb and Gutter, Type B (Deduct) (210) LFT $35.00 ($7,350.00) $39.50 ($8,295.00) $30.86 ($6,480.60) $45.00 ($9,450.00)A12. Line, Thermoplastic, Solid, White, 6" (Deduct) (195) LFT $2.00 ($390.00) $1.95 ($380.25) $8.00 ($1,560.00)$8.00 ($1,560.00)A13. Transverse Line, Thermoplastic, White, 24", Crosswalk (Deduct) (190) LFT $15.00 ($2,850.00) $9.25 ($1,757.50) $17.00 ($3,230.00) $17.00 ($3,230.00)A14. Pavement Message Marking, Multicomponent, Tabled Intersection 3 EA $850.00 $2,550.00 $425.00 $1,275.00 $1,000.00 $3,000.00 $1,000.00 $3,000.00Total$33,640.00 $32,625.80* $45,773.25 $51,000.00Acknowledge Addendum No. 1Yes Yes YesAcknowledge Addendum No. 2Yes Yes YesBid Tab SummaryEngineer's Estimate Selge Construction Rieth-Riley Construction Milestone Contractors$2,773,170.00 $2,559,630.45 $3,132,760.77 $2,933,000.00$2,806,810.00 S2,592,256.25* $3,178,534.02 $2,984,000.00*Corrected by EngineerI hereby certify that the above truly and accurately represents bids received for this project on May 13, 2025May 15, 2025Chad Knip, P.E.Abonmarche Consultants, Inc.Base Bid + Add Alt A (Base + Raised Intersection)Base Bid2 of 2
|