My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 2:38:37 PM
Creation date
5/27/2025 2:38:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
UNITED CONSULTING ■ CITY OF SOUTH BEND ■ CE SERVICES FOR SAFE ROUTES TO SCHOOL AT KENNEDY ACADEMY ■ DES# 2201237 7 <br />Monthly monitoring and updates on the project budget will ensure cost control. Preparing the contractor’s bi-monthly pay applications on time, <br />in comparison to planned quantities and projected costs of future work, will keep the project on budget. <br />UPDATED REPORTS <br />Along with the site manager reports, weekly progress reports, including key pictures of current activities, will be provided to South Bend. <br />These updates can be distributed to all affected stakeholders. <br />Keep change orders below 3%Research all claims and <br />provide cost effective solutions <br />Presents solutions instead of <br />problems to the city <br />Reduce project delays Solve construction related <br /> issues at the project level <br />Respectfully reduces the time city <br />staff commits to project concerns <br />Protect the project budget Verify quantities daily and <br />discuss at progress meetings <br />Keeps South Bend <br />aware of the budget <br />Utility coordination Invite impacted utilities to <br />all progress meetings <br />Reduces impacts <br />to project schedule <br />PROJECT COST <br />CONTROL GOALS <br />ACHIEVEMENT <br />PROCESS <br />BENEFITS TO THE <br />CITY OF SOUTH BEND <br />PROJECT PHOTOS <br />Bridge 1 Bent 1 headwall Bridge 3 bent 1 headwall <br />Forming bridge 1 bent 2 headwall Rolling stone between bridge 1 and 3 <br />Owner: <br />Day and <br />Date <br />Sun <br />8/29/21 <br />Mon <br />8/30/21 <br />Tues <br />8/31/21 <br />Wed <br />9/1/21 <br />Thurs <br />9/2/21 <br />Fri <br />9/3/21 <br />Sat <br />9/4/21 <br />Prepared by: <br /> <br />Approved <br />Morphey is going to continue forming bridge headwalls and placing final aggregate <br />elevations in advance of paving operations next week <br />This Report: <br />City of Beech Grove Designer:Crossroad Engineers <br />Work in Progress <br />No Work Today <br />Current Controlling <br />Operations <br />Pedestrian Trail Subgrade <br />Reasons for Reporting As a Work Day or <br />Non-Work Day <br />Contractor on-site <br />Pedestrian Trail Subgrade <br />Morphey worked on final Subgrade from bridge 1 <br />to bridge 3 and poured the headwalls fro bridge 3 <br />bent 1 and brige 1 bent 1 <br />Contractor:Morphey Construction <br />Beech Grove Greenway Trail <br />9/4/2021 <br />10/5/2020 <br />Report No.: <br />11/15/2022 <br />Date of Notice to Proceed: <br />For Week Ending: <br />Project Name: <br />5 Total to Date:127 <br />Contract Number: <br />Project Number: <br />Structure Number: <br />Calendar Completion Date: <br />33 <br />Morphey not on-site holiday weekend <br />Paid To Date:1,825,590.00$ <br />Balance Remaining:Work Days Previously Reported:122 3,429,000.00$ Contract Amount: <br />Pedestrian Trail Subgrade <br />Morphey removed froms from bridge 3 bent 1 <br />and bridge 1 bent 1 and formed and formed the <br />headwall from bridge 1 bent 2 <br />Morphey started placing final stone grade <br />between bridge 3 and 1 and formed bridge 2 bent <br />1 headwall <br />Morphey finished forming bridge 2 bent 1 <br />headwall and began placing topsoil on slopes <br />leading to bridge 1 and poured headwall for <br />Morphey placed most of the final grade from <br />bridge 4 to Hornet Ave, finished final stone grade <br />between bridge 3 and bridge 1 and started <br />cc: Contractor <br />Fraction of Day <br />Workable <br />0/24 <br /> 12/24 <br /> 12/24 <br /> 12/24 <br /> 12/24 <br />Contractor not on-site <br />Contractor on-site <br />Contractor on-site <br />Contractor on-site <br />Contractor on-site <br />Pedestrian Trail Subgrade <br />Pedestrian Trail Subgrade <br />Pedestrian Trail Subgrade <br />Pedestrian Trail Subgrade <br />Work Days <br />Charged <br />Jay Niederhauser <br />Construction Manager <br /> WEEKLY REPORT OF CONSTRUCTION ACTIVITES <br />Project Complete Percent: <br />R-39660 <br />1600657 <br />CONTRACTOR ACCEPTANCE <br />Jason Umlauf <br />Project Manager - Morphey Construction <br />Distribution: <br />Original to Owner <br />cc: Project Engineer <br />cc: District File <br />REMARKS / PROJECTED WORK <br />Contractor not-site <br />1,603,410.00$ <br />53% <br />Project Supervisor - United Consulting <br />7-Sep 2021 <br />Jay Niederhauser <br /> 12/24 <br />0/24 <br />0 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0 <br />Page 1 of 1 <br />PROJECT APPROACH <br />COST CONTROL PLAN <br />EXAMPLE WEEKLY REPORT
The URL can be used to link to this page
Your browser does not support the video tag.