My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 2:38:37 PM
Creation date
5/27/2025 2:38:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
UNITED CONSULTING ■ CITY OF SOUTH BEND ■ CE SERVICES FOR SAFE ROUTES TO SCHOOL AT KENNEDY ACADEMY ■ DES# 2201237 5 <br />The project is currently scheduled to let in November of 2025. We anticipate a Notice-to-Proceed <br />to be issued around January of 2026 for a spring or summer of 2026 construction. With the project <br />scope and location, the ideal schedule for the project would be when local schools are closed for <br />summer break. <br />No plans were available for review at the time the LOI was prepared. It is our understanding the <br />project includes the replacement of pedestrian sidewalks and ADA ramps around the area of <br />Kennedy Academy (see map below for impacted areas). The project area has several ramps and <br />sidewalk crossings that do not meet current ADA standards. <br />From our site visit and familiarity with the area (from previous local sidewalk and ramp replacement <br />projects), we expect a high level of coordination effort to be required throughout the project with <br />the project limits, Kennedy Water Park, South Bend Animal Resource Center, and other surrounding <br />businesses. Keeping all impacted parties up to date with the current areas of sidewalk closures will <br />be important to maintain safe pedestrian travel throughout the project duration. <br />PROJECT AREA <br />PROJECT APPROACH <br />LINCO <br />L <br />N <br /> <br />W <br />A <br />Y <br /> <br />W <br />LINCO <br />L <br />N <br /> <br />W <br />A <br />Y <br /> <br />W <br />ORANGE STORANGE STN OLIVE ST.N OLIVE ST.SOUTH BEND ANIMAL RESCUE CENTER <br />KENNEDY WATER PARK <br />KENNEDY ACADEMY <br />NN <br />BIRDSELL STBIRDSELL STN BENDIX DRN BENDIX DR
The URL can be used to link to this page
Your browser does not support the video tag.