Laserfiche WebLink
7PROJECT MANAGER PROJECT TEAM PROJECT APPROACH PROJECT EXPERIENCE <br />PROJECT APPROACH <br />SJCA INC | CITY OF SOUTH BEND RFP | CONSTRUCTION INSPECTION | KENNEDY ACADEMY <br />UTILITIES <br />This project has several utilities that are likely to present issues. Even with pre-project <br />utility movement, there will likely be utilities that were not moved promptly or are <br />completely unexpected. Therefore, the inspection team will need to maintain close <br />contact with the LPA, INDOT, and utility companies to ensure that utility issues are <br />dealt with in a prompt and safe fashion. Also, it will be necessary to confirm that the <br />contractor is up to date with having utilities marked at work locations with the proper <br />frequency. This will help avoid project delays and the disruption of vital utility services. <br />SAFETY <br />On-site safety is SJCA’s highest priority. Any unsafe practices observed will be <br />documented and stopped immediately. If necessary, the City and/or Area Engineer <br />will be notified. Environmental concerns, such as dust and stormwater leaving the <br />job site, will also be monitored. At the end of each workday, the site will be checked <br />for cleanliness and hazards to ensure public safety during off-hours. All personnel to <br />be assigned to this project are familiar with INDOT’s latest record-keeping program, <br />current standard specifications, testing frequency requirements, and stormwater <br />control measures. <br />Heavy foot traffic can be anticipated and <br />utility adjustment may be needed near this <br />recreational water park in the neighborhood. <br />Removal of tripping hazards. <br />Replacement of sidewalk and ramps. <br />Replacement of damaged sidewalk. <br />Coordination with utilities for new sidewalk. <br />Ramps and crosswalks to be updated.