Laserfiche WebLink
City of South Bend | CE Services for Safe Routes to School at Kennedy Academy | Page 8 <br />PROJECT EXPERIENCE <br />City of Noblesville Nickel Plate Multi-Use <br />Trail <br />The 2.7 mile multi-use trail funded with DNR Next Level Trails grant provided a new ADA accessible path beginning on the north side of 146th Street and extends north to Pleasant Street in Downtown Noblesville. <br />The trail crosses two bridges, one over Allisonville Road and the other over Stony Creek. Both bridges required rehabilitation and painting with additional amenities provided throughout this project including timber bridge railing, pedestrian wooden railings as required, decorative signage, mile marker posts, pavement marking medallions and benches located along the trail. <br />City of Indianapolis DPW Central Greens <br />Development Phase 4 <br />New construction of Steeples Boulevard north of Kirkbride Way to Vermont Street. This project also included a reconstruction of Kirkbride Way west of the intersection with Steeples Boulevard and included the West Drive before new construction extended to Tibbs Avenue. <br />Development improvements included storm drains, hybrid ditches, subgrade treatment, full depth HMA, driveways, curb and gutter, sidewalks and ADA ramps. Other miscellaneous items include RPM’s, signage and tree plantings. <br />City of Indianapolis DPW Pedestrian Crash <br />Focus Area 5B <br />This project consists of curb ramp and pedestrian crosswalk improvements at (18) separate intersections along 36th Street and Meadows Parkway in Indianapolis. Project improvements included (35) ADA compliant curb ramps, sidewalks, street approaches, curb and gutter, storm sewers, asphalt, RRFBs, signage and pavement markings. Etica Group performed our detailed constructibility review for this project prior to the preconstruction meeting and found a few correctable items. The designers were able to make the needed design changes prior to the start of construction. Pedestrian Maintenance of Traffic was a major component of this project. Our team required the contractor to have all sidewalk closed, signage and walking detour established prior to breaking ground at each intersection. <br />This project was completed on time and under budget!