My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - Etica Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - Etica Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 2:38:22 PM
Creation date
5/27/2025 2:38:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend | CE Services for Safe Routes to School at Kennedy Academy | Page 7 <br />PROJECT APPROACH <br />Lincoln and MeadeAdams and Lincoln <br />CONSTRUCTION PHASEChad Smith has experience in communicating with homeowners about construction schedules and public safety during the construction process all while ensuring the contractor is using “Best Management Practices” for safety, maintenance of traffic and erosion control. Etica Group knows even though pedestrian safety improvement projects are generally welcomed by the public to enhance safety, many residents or businesses prefer the construction not to be in their front yards. We will participate in these interactions and coordinate with the Contractor and the City to reduce the time City staff must invest in this important activity. <br />Maintenance of Traffic is an especially notable concern on this project, and Chad possesses the additional Maintenance of Traffic Certificates from the FHWA and recognized by INDOT. Chad has direct experience in dealing with maintenance of traffic (MOT) and property owners if concerns arise about signage and safety. <br />The safety of vehicular and pedestrian traffic is a top priority; therefore, we hold the contractor accountable for proper maintenance of traffic with correct temporary traffic control signage as well as correct sidewalk closed signage. <br />Our team will ensure proper curb ramp and sidewalk grades during construction by checking all forms for accuracy prior to the pours, and by confirming final cross and running slopes once the curb ramps and walks are set. We will hold the contractor accountable for constructing ADA compliant curb ramps and sidewalks per the approved plans. <br />Your Project Manager, Chad Smith, will remain your full-time point of contact for the project as he oversees daily activities and coordinates with supporting inspectors. Our team carries experience from a wide variety of infrastructure including typical roadway and pedestrian-focused improvements. We are very familiar with the work the construction of a multiuse trail often involves.
The URL can be used to link to this page
Your browser does not support the video tag.