My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - American Structurepoint Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - American Structurepoint Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 2:38:06 PM
Creation date
5/27/2025 2:37:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND CE SERVICES FOR SAFE ROUTES TO SCHOOL AT KENNEDY ACADEMY AMERICAN STRUCTUREPOINT PAGE 3 <br />FIRM OVERVIEWRESOURCES THAT STREAMLINE THE CONSTRUCTION PROCESS <br />The American Structurepoint team offers a variety of unique resources that provide value-added benefits and efficiency <br />during the construction process. <br />TECHNICAL EXPERTISE <br />Over the last 59 years, our staff has provided <br />construction inspection services on more than <br />400 projects. Our inspectors have developed <br />an impressive set of technical capabilities that <br />allows them to document all the daily work tasks <br />performed at the job site. Our staff will use their <br />technical expertise on this project to: <br />• Track and document construction material <br />quantities <br />• Test and sample materials used <br />• Review daily maintenance of traffic <br />• Address all concerns for safety <br />• Maintain project accounting and contractor <br />payrolls <br />EFFICIENCY <br />The construction process can take a considerable <br />amount of time, which is why keeping an eye <br />on efficiency throughout the entire project is so <br />important. To complete the construction phase of <br />this project in the most efficient manner possible, <br />our team will: <br />• Make timely and knowledgeable decisions <br />• Quickly evaluate immediate/long-term effects <br />of our decisions <br />• Coordinate among all parties through <br />transparency, communication, and fairness <br />• Quickly complete required project closeout <br />activities <br />• Prepare/submit final construction record <br />within 45 days of contractor’s relieved-of- <br />maintenance date <br />TOOLS <br />Our team is equipped with the most up-to-date <br />equipment to provide the highest level of service. <br />• Cell Phones: Every member of our team <br />is equipped with a company-provided <br />smartphone that allows them to receive calls, <br />text messages, and emails 24/7. <br />• Computer: Every member of our team is <br />equipped with a Microsoft Surface computer <br />that functions as both a traditional laptop and <br />a handheld tablet. This allows them to have <br />project plans and specifications with them at <br />all times while in the field. <br />• Drones: Our Inspection Staff has a drone <br />that allows our staff to take aerial photos of <br />the jobsite to provide another view of the <br />construction progress.
The URL can be used to link to this page
Your browser does not support the video tag.