My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to OEA - Wastewater Treatment WAS Thickening Improvements Proj No 123-031 - Black & Veatch
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to OEA - Wastewater Treatment WAS Thickening Improvements Proj No 123-031 - Black & Veatch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:54:28 PM
Creation date
5/13/2025 1:54:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT K, consisting of 4 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , . <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. __2___ <br />1.Background Data: <br />a.Effective Date of Owner-Engineer Agreement:July 25, 2023 <br />b.Owner:City of South Bend, Indiana <br />c.Engineer: Black & Veatch Corporation <br />d.Project:123-031 WWTP DAF Building Improvements <br />2.Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />Task 101 – Project Management and Administration <br />Engineer will continue to support the project for an additional 20 months including <br />additional project coordination, invoicing, and management. <br />Task 104 – Design and Contract Document Development <br />For Bid Package No. 1 (123-031A): Engineer produced three structural drawings and <br />related specifications related to removal and replacement of the south exterior stair, <br />foundation, and railings at the Degrit Building. <br />For Bid Package No. 2 (123-031B): Engineer produced an additional 32 drawings, <br />resulting in a total of 62 drawings, as well as additional technical specifications. The <br />work included additional scope for mechanical process, structural, electrical, <br />instrumentation and control, and plumbing disciplines. <br />For Bid Package No. 2 (123-031B): Engineer shall design HVAC system upgrades to <br />be included as an Addendum to the Bidding Documents. These upgrades will enable <br />the existing DAF Building (new GBT Building) to achieve continuous ventilation at the <br />required six Air Changes per Hour (ACH), ensuring the NEC Hazardous Location <br />Classification of the building remains unclassified, as specified in NFPA 820 (2024), <br />Table 6.2.2(a), Solids Treatment Processes, row 8, line c.
The URL can be used to link to this page
Your browser does not support the video tag.