My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ratify Emergency Contract - State Theater Roof Repairs Proj No 125-030 - Slatile Roofing (2)
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Ratify Emergency Contract - State Theater Roof Repairs Proj No 125-030 - Slatile Roofing (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:53:23 PM
Creation date
5/13/2025 1:52:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Established 1924 <br />ROOFING – MASONARY RESTORATION – SHEET METAL <br /> <br />5/6/2025 <br /> <br />ATTN: Zach Hurst <br /> <br />RE: State Theater Critical Needs Assessment Repairs Proposal <br /> <br />Install personal fall protection for all of the following work to be performed. <br />Repair large hole in roof deck at Northeast corner: Square the existing opening. <br /> Fabricate and install 16ga galvanized Z supports and 22ga metal B deck. <br />Open existing scuppers. Fabricate new metal scupper sleeves to connect to external downspouts for <br />main water drainage. <br /> Rework and repair existing external downspouts. <br /> Remove loose coping metal and EPDM membrane at Southeast wall. <br /> Install 10’ wide .060 EPDM membrane along North and South walls. <br />Utilize weather resistant sand bags for temporary ballast where the membrane cannot be adhered or <br />fastened. <br />Seal and adhere to existing membrane, extend over parapet walls, and secure with termination bar to <br />exterior brick face. <br />Seal top of new EPDM at existing termination bar where the wall changes to terra cotta stone. <br />Remove three large metal vents, cap, and seal existing openings. <br />Inspect the entire roof surface for holes or splits, repair as needed. <br />Remove all loose debris from the roof surface. <br /> <br />Total Cost $196,812.00 <br /> <br />Thank you for the opportunity to quote this project. If you have any questions or concerns, please feel <br />free to contact me. Cell 574-440-5926 or email, ken.hoy@slatile.com <br /> <br />Sincerely, <br />Ken Hoy Jr. <br />Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.