BID/PROPOSAL Addendum No. 2
<br />CITY OF SOUTH BEND
<br />32.
<br />PCCP, Colored, 6"
<br />25
<br />SYD
<br />$346.57
<br />$8,664.25
<br />33.
<br />PCCP for Approaches, 6"
<br />80
<br />SYD
<br />$103.31
<br />$8,264.80
<br />34.
<br />PCCP for Approaches, 8"
<br />156
<br />SYD
<br />$112.75
<br />$17,476.25
<br />35.
<br />D-1 Contraction Joint
<br />105
<br />LFr
<br />$32.56
<br />$3,418.80
<br />36.
<br />Concrete Curb
<br />1,265
<br />LFr
<br />$39.34
<br />$49,765.10
<br />37.
<br />OMITTED
<br />38.
<br />Concrete Curb and Gutter, Type B
<br />2,325
<br />LFr
<br />$30.86
<br />$71,749.50
<br />39.
<br />Concrete Curb and Gutter, Depressed
<br />300
<br />LFr
<br />$52.58
<br />$15,774.00
<br />40.
<br />Concrete Sidewalk, 4"
<br />1,700
<br />SYD
<br />$57.81
<br />$98,277.00
<br />41.
<br />Concrete Curb Ramp
<br />250
<br />SYD
<br />$179.54
<br />$44,885.00
<br />42.
<br />Concrete Curb Ramp, Colored
<br />140
<br />SYD
<br />$250.71
<br />$35,099.40
<br />43.
<br />Detectable Warning Surface
<br />50
<br />SYD
<br />$59.49
<br />$2,974.50
<br />44.
<br />Mulched Seeding, Type "U"
<br />8,400
<br />SYD
<br />$1.30
<br />$10,920.00
<br />45. -
<br />Sodding
<br />3,000
<br />SYD
<br />$9.86
<br />$29,580.00
<br />46.
<br />Street Tree
<br />27
<br />EA
<br />$695.00
<br />$18,765.00
<br />47.
<br />Storm Sewer Manhole, 48"
<br />16
<br />EA
<br />$6,072.25
<br />$97,156.00
<br />48.
<br />Storm Sewer Catch Basin
<br />7
<br />EA
<br />$3,370.60
<br />$23,594.20
<br />49.
<br />OMITTED
<br />50.
<br />OMITTED
<br />51.
<br />Storm Sewer Pipe, 12"
<br />1,193
<br />LFr
<br />$60.35
<br />$71,997.55
<br />52.
<br />Storm Sewer Pipe, Water Main Grade, 12"
<br />44
<br />LFr
<br />$84.59
<br />$3,721.96
<br />53.
<br />Storm Sewer Pipe, 18"
<br />583
<br />LFr
<br />$83.17
<br />$48,488.11
<br />54.
<br />Storm Sewer Pipe, Water Main Grade, 18"
<br />75
<br />LFr
<br />$107.26
<br />$8,044.50
<br />55.
<br />OMITTED
<br />56.
<br />OMITTED
<br />57.
<br />Underground Storm Sewer System
<br />1
<br />LS
<br />$907 558.19
<br />$907,558.19
<br />58.
<br />Fire Hydrant, Assembly
<br />1
<br />EA
<br />$9,548.46
<br />$9,548.46
<br />59.
<br />Water Main, 4"
<br />30
<br />LFr
<br />$182.77
<br />$5,483.10
<br />60.
<br />Bend, 45 Degree, 4"
<br />4
<br />EA
<br />$1,121.98
<br />$4,487.92
<br />61. IOMITTED
<br />62.
<br />Adjust Casting to Grade
<br />8
<br />EA
<br />$616.49
<br />$4,931.92
<br />63.
<br />Sheet Sign, 0.080 in.
<br />128
<br />SFr
<br />$24.00
<br />$3,072.00
<br />64.
<br />Sheet Sign, 0.125 in.
<br />15
<br />SFr
<br />$29.00
<br />$435.00
<br />66.
<br />Sign Past, Square, Type 2, Reinforced Anchor Base
<br />325
<br />LFr
<br />$20.00
<br />$6,500.00
<br />66.
<br />Solar Powered Flashing Pedestrian Crossing Signage Assembly
<br />2
<br />EA
<br />$12,000.00
<br />$24,000.00
<br />67.
<br />Lighted Bollard
<br />8
<br />EA
<br />$5,000.00
<br />$40,000.00
<br />68.
<br />Line, Thermoplastic, Solid, White, 4"
<br />1,875
<br />LFr
<br />$5.00
<br />$9,375.00
<br />69.
<br />Line, Thermoplastic, Solid, White, 4", Grooved
<br />880
<br />LFr
<br />$6.00
<br />$5,280.00
<br />Version 5/20/2024 Contractor's Bid for Public Works - 8
<br />
|