Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Addendum No. 2 <br />o�SouTH ��M <br />o <br />t: <br />� a <br />GS PCACE ,; <br />saes <br />For Bids Due: May 13, 2025 <br />Contractor Name: Rieth-Rilev Construction Co., Inc. <br />Base Bid <br />Project Name: Wall Street and Greenlawn Avenue Improvements <br />Project Number: 124-023B <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />$18,500.00 <br />$18,500.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />$105,132.59 <br />$105,132.59 <br />3. <br />CPM Schedule <br />1 <br />LS <br />$563.32 <br />$563.32 <br />4. <br />CPM Monthly Update <br />5 <br />MO <br />$350.00 <br />$1,750.00 <br />5. <br />Maintenance of Traffic <br />1 <br />LS <br />$32,275.16 <br />$32,275.16 <br />6. <br />Erosion Control <br />1 <br />LS <br />$15,846.12 <br />$15,846.12 <br />7. <br />Clearing Right of Way <br />1 <br />LS <br />$18,101.96 <br />$18,101.96 <br />8. <br />Common Excavation <br />9,010 <br />CYD <br />$30.85 <br />$277,958.50 <br />9. <br />Borrow <br />4,195 <br />CYD <br />$73.59 <br />$308,710.05 <br />10. <br />Tree, 6", Remove <br />8 <br />EA <br />$200.00 <br />$1,600.00 <br />11. <br />Tree, 10", Remove <br />8 <br />EA <br />$500.00 <br />$4,000.00 <br />12. <br />Tree, 18", Remove <br />9 <br />EA <br />$1,400.00 <br />$12,600.00 <br />13. <br />Tree, 30", Remove <br />2 <br />EA <br />$2, 000.00 <br />$4, 000.00 <br />14. <br />Sign, Remove <br />32 <br />EA <br />$141.94 <br />$4,542.08 <br />15. <br />Sign, Relocate <br />2 <br />EA <br />$614.38 <br />$1,228.76 <br />16. <br />Pipe, Remove <br />50 <br />LFr <br />$62.26 <br />$3,113.00 <br />17. <br />Structures, Remove <br />3 <br />EA <br />$778.30 <br />$2,334.90 <br />18. <br />Fire Hydrant, Remove <br />1 <br />FA <br />$1,556.61 <br />$1,556.61 <br />19. <br />Concrete Curb, Remove <br />3,145 <br />LFr <br />$17.49 <br />$55,006.05 <br />20. <br />Concrete Approaches and Sidewalk, Remove <br />320 <br />SYD <br />$42.84 <br />$13,708.80 <br />21, <br />Concrete Pavement, Remove <br />75 <br />SYD <br />$100.36 <br />$7,527.00 <br />22. <br />Brick, Remove <br />25 <br />SYD <br />$124.53 <br />$3,113.25 <br />23. <br />Milling, Varible Depth <br />460 <br />SYD <br />$24.09 <br />$11,081.40 <br />24. <br />OMITTED <br />25. <br />Compacted Aggregate, No.53 <br />2,940 <br />TON <br />$41.89 <br />$123,156,60 <br />26. <br />HMA Surface <br />650 <br />TON <br />$116.22 <br />$75,543.00 <br />27. <br />HMA Intermediate <br />1,010 <br />TON <br />$103.22 <br />$104,252.20 <br />28. <br />HMA Base <br />1,495 <br />TON <br />$87.93 <br />$131,455.35 <br />29. <br />Joint Adhesive <br />3,220 <br />LFr <br />$2.66 <br />$8,565.20 <br />30. <br />PCCP, 8" <br />350 <br />SYD <br />$119.44 <br />$41,804.00 <br />I. <br />PCCP, Colored, 8" <br />111) <br />SYD <br />$172.78 <br />t $19,005.80 <br />Version 5/20/2024 Contractor's Bid for Public Works - 7 <br />