My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - Ameresco Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - Ameresco Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:16:24 PM
Creation date
1/28/2025 11:42:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AERESCO Energy Solutions <br />m For Every Need <br />to solicit pricing directly from manufacturers at a national level to obtain competitive pricing for high quality products. <br />Ameresco is vendor neutral; however, with our experience, we recommend the following products or equal for this project. <br />We have used all these manufacturers on past projects. We focused on cost effective products with long warranties to <br />increase value for the City. The use of SolarEdge inverters not only provides increased production through the optimizers <br />but also has an integrated data acquisition system which is free to the customer for the life of the equipment. There are no <br />subscription fees unless the City would prefer a cellular connection to an ethernet connection. <br />Inverters: SolarEdge SE100KUS with S1201 optimizers <br />Racking: Panel Claw clawFRplus 10 degrees <br />Data Acquisition System (DAS): SolarEdge <br />Performance Warranties I Proposed Warranties <br />Please refer to the following table for equipment performance warranties for the proposed project components. We have <br />included standard warranties but are happy to discuss extended warranties, if desired. <br />Proposed Component Warranties <br />Equipment <br />Manufacturer <br />Warranty Provisions <br />• 12-year material warranty <br />Solar Module <br />Jinko <br />• 30-year performance warranty <br />• 84.95% of production at the end of year 30 <br />Inverter <br />Solar Edge <br />• Standard 12-year warranty <br />• Warranty extensions to 25 years are available. <br />Optimizer <br />Solar Edge <br />• Standard 25-year warranty <br />Racking <br />Panel Claw <br />• Warranty for defects that impair the use of the product <br />for a period of twenty-five (25) years <br />Data Acquisition <br />SolarEdge <br />• Standard 12-year warranty <br />System <br />Performance Contracting Firm I National & Local <br />Ameresco, Inc. has been in the performance contracting business under its current name since 2000. From the inception <br />of its predecessor firms, Ameresco and its predecessors has been offering energy related services in the energy industry <br />for over 42 years. Ameresco's revenue for 2023 was $1.37 billion, and approximately seventy percent (70%) of our <br />business is conducted on a performance contracting basis. Our local presence in Indiana covers the entire state, and most <br />of the $150 Million in projects, have been completed under an energy savings performance contract. <br />City of South Bend, IN I Department of Public Works I RFQ Guaranteed Energy Savings Contract SBCFS & MLK Center 1 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.